Pindi Sahota — Builder, 32 Years & Founder of RenoCalc
Try Free — No Card Needed
Pindi Sahota — Builder and Founder of RenoCalc, Coventry
32 Years on the Tools
Dir. Future Build Cov Ltd
Co. No. 12311977
VAT 470961573

Pindi Sahota

Builder & Founder of RenoCalc • 32 Years on the Tools • Coventry, UK

Pindi Sahota started in the building trade in 1992. Over the next three decades he worked across plastering, general building, full house renovations, extensions, loft conversions and commercial refurbishments. In 2019 he founded Future Build Cov Ltd. In 2023 he built RenoCalc — the AI quoting tool he always needed but could never find.

32
Years on the tools
1,000+
Builders using RenoCalc
150+
Countries reached
3 min
Floor plan to quote
Every builder I know wastes hours every week writing quotes that could be done in minutes. I built RenoCalc because I was one of them, and I was sick of it.

Pindi Sahota — Builder, 32 years • Founder, RenoCalc

32 Years in the Building Trade

Pindi Sahota started as a plasterer in Coventry in the early 1990s. He learned the trade properly — wet plaster on solid walls, floating and setting, artex removal, dot and dab — before broadening into general building work. Over three decades he has managed renovation projects ranging from single-room refurbishments to full house gut-outs, property developments, HMO conversions and commercial office fits.

That breadth of experience is what makes his writing different. When Pindi writes about how to quote a bathroom renovation, he isn't drawing on theory. He's drawing on hundreds of bathroom quotes, the jobs that went over budget, the ones that didn't, and the hard lessons that came with both. Every article on RenoCalc is written from direct trade experience, not borrowed from someone else's content.

Based in Coventry, he is the director of Future Build Cov Ltd (Company No. 12311977, VAT 470961573), registered at 242 Hollyfast Road, Coundon, Coventry CV6 2AH.

The Problem He Kept Hitting

The frustration started slowly. Every time a client asked for a quote, Pindi would go home, open a spreadsheet, and start working through the rooms. Measure from the floor plan. Calculate plaster area. Work out tiling. Price the materials. Add labour. Do it again for the next room. Repeat for every trade.

Two hours. Sometimes three. For a single quote. And if the client wanted a revision — a smaller kitchen, a different specification — it meant going through the whole thing again.

In 2023, Pindi started building RenoCalc. Not as a software project in the conventional sense — he brought in technical partners for the development — but as a product built entirely around a builder's requirements. Every feature in RenoCalc exists because he needed it. The AI floor plan scanner. The trade-by-trade breakdown. The Excel output. The cover letter. The method statements. The schedule of works. All of it.

The result is software that turns a floor plan image into a complete professional quote pack — ready to send to a client — in under three minutes. Builders in over 150 countries now use it.

Career Timeline

Early 1990s
Started as a Plasterer, Coventry
Wet plaster, floating and setting, rendering, artex removal. Learnt the trade from the ground up on residential sites across the West Midlands.
Late 1990s
Expanded into General Building
Took on full renovation contracts covering carpentry, tiling, first and second fix, and project management. Started running his own small crews.
2000s
Full Renovation Projects and Property Development
Moved into full house refurbishments, extensions, loft conversions and HMO conversions. Developed a detailed understanding of construction costing at every trade level.
2010s
Commercial Refurbishment and Estimating
Added commercial office and retail fit-out work. Spent years pricing jobs manually — and increasingly frustrated by how long it took.
2019
Founded Future Build Cov Ltd
Established Future Build Cov Ltd as the formal entity for his construction operations. Company No. 12311977, registered in England and Wales.
2023
Built RenoCalc
Developed and launched RenoCalc — AI renovation quoting software that generates a complete quote pack from a floor plan in under 3 minutes. Solved the problem he had lived with for decades.
2025–2026
RenoCalc Reaches 1,000+ Builders in 150+ Countries
RenoCalc grows beyond the UK. Builders across Europe, North America, and Australia adopt the platform. Continues writing practical guides drawing on 32 years of trade knowledge.

What Pindi Writes About

Every article Pindi publishes on RenoCalc is grounded in the specific knowledge that comes from three decades of building work. He writes about renovation costs, construction quoting, trade pricing, estimating software and the business side of running a building firm — all from a first-person perspective.

He also writes about the costly mistakes that come with the trade. His article on the £400,000 job that nearly finished him is one of the most widely read pieces on the site — because it's real, and because every builder recognises something in it.

Articles by Pindi Sahota

Written from 32 years of trade experience. Every cost figure, every trade breakdown, every pricing method — verified from the tools.

The £400,000 Job That Nearly Finished Me

How to Estimate Renovation Costs Before Buying a Property

Loft Conversion Cost UK 2026: Dormer vs Velux vs Hip-to-Gable

Extension Cost Per Square Metre UK: Single, Double and Wraparound

Full House Refurbishment Cost UK: What £20k, £40k and £60k Actually Buys

Bathroom Renovation Cost UK: Full Breakdown by Room Size

Kitchen Renovation Cost UK: What Builders Actually Charge

HMO Conversion Cost UK: 4-Bed, 5-Bed and 6-Bed Breakdowns

Garage Conversion Cost UK: Habitable Room Breakdown by Trade

How to Quote a Bathroom Renovation: Step-by-Step for Builders

How to Quote a Full Rewire: Cable, Sockets and Consumer Unit Maths

How to Quote a Stud Partition Wall: Timber, Plasterboard and Skim

How to Price Up a Tiling Job: Square Metres, Adhesive and Grout

How to Calculate Plastering Costs Per Square Metre UK

How to Estimate Second Fix Carpentry: Skirting, Architraves, Doors

Bill of Quantities Explained: What a BOQ Is and How to Make One

Schedule of Works Template: How to Phase a Renovation Properly

Domestic Building Contract UK: What Every Builder Must Include

Method Statement Template UK: What HSE Actually Requires

How to Measure a Room from a Floor Plan (Without a Tape Measure)

How to Read Estate Agent Floor Plans for Renovation Quoting

Rightmove Floor Plan to Renovation Budget in Under 5 Minutes

How Much Does It Cost to Renovate a 3-Bedroom House UK (2026)

BRRRR Strategy UK: Calculating Refurb Costs Accurately

Flipping Houses UK: How to Cost a Refurb Before You Offer

BTU Calculator Per Room UK: How to Size Radiators Correctly

Best Construction Estimating Software UK 2026 (Builder-Tested)

Free Building Estimating Software UK: What's Worth Using

Powered Now Review: Honest Pros and Cons from a Working Builder

Tradify vs RenoCalc: Which Quoting Software Wins for Builders?

YourTradebase Alternatives UK: Cheaper Quoting Tools Compared

Tired Of Quoting All Night? Stop.

See What 3-Minute Quoting Looks Like.

Upload a floor plan. Get a complete renovation quote. First one is completely free.

Try Free — No Card Needed