RenoCalc is construction takeoff software UK builders use to price jobs fast. Upload any floor plan — PDF, image or drawing — and the AI measures every room, calculates quantities for 12 trades, and produces a professional quote pack in under 3 minutes. No manual tracing, no expensive subscriptions.
Get My Free QuoteNo credit card needed ✦ First quote completely free ✦ Built by a builder of 32 years
See It Happen
Upload any floor plan and watch the AI perform a full construction takeoff in real time — room dimensions, material quantities, and trade-by-trade costs, all calculated in under 3 minutes.
Most construction takeoff software UK builders encounter was built for large contractors — expensive annual licences, weeks of setup, and a dedicated estimator to operate. RenoCalc is different: pay-as-you-go, no setup needed, and a complete takeoff from a floor plan upload in 3 minutes flat.
It's cloud estimating software that works on site, at home, or on the go — no desktop installation, just a browser. Need a broader look? Compare material takeoff software, AI material takeoff, and AI quantity takeoff — all built on the same platform.
Try the Scanner Free
Built by a Builder
RenoCalc was built by Pindi Sahota — a UK builder with 32 years on the tools. Every formula, every trade, every HSE requirement is based on real UK construction practice.
RenoCalc is construction takeoff software UK companies of all sizes rely on — from a sole trader pricing bathroom refurbs to a contractor running multiple projects simultaneously. The AI covers all 12 renovation trades in one takeoff, so you're not juggling separate tools for flooring, plumbing, electrics and plastering. See also renovation material takeoff and takeoff from floor plan for related tools.
RenoCalc isn't just a contractor estimating platform — it's construction planning software UK builders use to run the whole front-end of a job. From the initial quote to the schedule of works, method statements, and a 12-page contract pack, everything is generated from the floor plan. The RenoCalc Spreadsheet shows costs itemised by trade, so your client can see exactly what they're paying for.
A lot of construction takeoff software UK companies have used for years was built for a world of desktop installs, licence dongles and IT support contracts. RenoCalc runs entirely in the cloud — there's nothing to install, nothing to update, and no server for a two-man firm to maintain. Log in from a site office laptop in the morning and pick up the same quote from a phone on site that afternoon.
That matters more than it sounds. Traditional takeoff packages that live on one desktop create a bottleneck — whoever has that machine is the only one who can price a job. Cloud-based takeoff means any authorised person on the team can open the same account, on any device, and see the same numbers.
Construction takeoff software UK contractors use to run a growing team needs to solve a different problem to the tool a sole trader needs. Once you've got a site manager pricing variations, an office estimator producing the main quote, and a director signing off the contract, everyone needs to be looking at the same set of quantities — not three different spreadsheets that quietly drift apart over the course of a job.
Because every RenoCalc takeoff downloads as a single, shareable spreadsheet with every trade broken out and every formula visible, the whole team works from one source of truth. A site manager can flag a quantity that doesn't match what's actually on the ground, the estimator adjusts the input, and the contract pack, schedule of works and cost breakdown all update together — automatically.
See How Teams Use RenoCalc
The RenoCalc Advantage
Here's how RenoCalc compares to the traditional way UK builders do construction takeoffs.
| Feature | Traditional Method | RenoCalc |
|---|---|---|
| Takeoff from floor plan | Manual measurement, hours of work | AI reads plan, done in 3 minutes |
| Software cost | Expensive annual licences | Pay-as-you-go from £9.99 |
| Trades covered | Usually one trade at a time | 12 trades in a single pass |
| Quote document | Typed up manually | Professional 5-doc pack generated |
| Cloud access | Often desktop-only | Works anywhere, any device |
| Contract pack | Separate solicitor cost | Included — 12-page HSE-aligned |
FAQs
Related Questions
Join 1,000+ builders who quote in minutes, not hours. First quote is completely free.
Generate My First Quote Free View Pricing