Upload any floor plan — PDF, image, hand-drawn or architect's drawing — and RenoCalc's AI will do the takeoff for you. Every room measured. Every material listed. Every trade covered. Building estimate from PDF plans has never been this fast.
Get My Free QuoteNo credit card needed ✦ First quote completely free ✦ Built by a builder of 32 years
See It Happen
Watch RenoCalc's AI read a floor plan from scratch — detecting walls, rooms, doors and windows — then calculate a complete material and quantity takeoff in real time.
Doing a takeoff from a floor plan by hand means scaling dimensions, measuring room by room, doing the maths for every trade. It's skilled work — and it takes hours. RenoCalc's floor plan OCR software reads the drawing automatically, so the AI does the measuring and you spend your time pricing and winning the job.
It works on PDF floor plans, scanned drawings, photographs of hand-drawn plans, and estate agent floor plan images. If you can read it, the AI can read it — and generate a building estimate from PDF plans that's ready to send as a professional quote pack.
Try the Scanner Free
Built by a Builder
RenoCalc is builders software that reads floor plans and automatically calculates material quantities, not just room areas — so you get a full trade-by-trade takeoff, not just a measurement.
RenoCalc's floor plan OCR software uses AI to detect room boundaries, measure floor areas, wall heights and perimeters, and calculate material quantities for every trade. It's construction document analysis AI designed specifically for renovation plans — it understands what a kitchen needs, what a bathroom needs, and what the whole house needs, all from a single upload.
Once the AI has read your floor plan and completed the takeoff, you get a full building estimate and professional quote pack. The RenoCalc Spreadsheet shows every material cost per trade and per room. The 5-document pack adds a schedule of works, HSE-aligned method statements, and a 12-page contract pack. It's the complete workflow — from floor plan to signed contract — without any manual steps.
The RenoCalc Advantage
Here's what doing your takeoff from a floor plan looks like with and without RenoCalc.
| Feature | Traditional Method | RenoCalc |
|---|---|---|
| Plan reading | Manual measurement with a scale rule | AI reads the plan automatically |
| Takeoff time | 4–6 hours minimum | Under 3 minutes |
| Plan formats accepted | Must be scaled and clean | PDF, image, hand-drawn all work |
| Trades calculated | Your trade only | 12 renovation trades |
| Output document | Notes and rough spreadsheet | 5-document professional quote pack |
| Contract | Not included | 12-page HSE-aligned pack |
FAQs
Join 1,000+ builders who quote in minutes, not hours. First quote is completely free.
Generate My First Quote Free View Pricing