Renovation Material Takeoff, Room by Room | RenoCalc
Try Free Now
RENOVATION MATERIAL TAKEOFF

Renovation Material Takeoff. Every Room. Every Trade.
Calculated From Your Floor Plan.

RenoCalc is renovation takeoff software that reads your floor plan and calculates materials for every room across 12 trades — flooring, tiling, plastering, painting, plumbing, electrics, and more. First quote is free. No credit card needed.

Get My Free Quote

No credit card needed  ✦  First quote completely free  ✦  Built by a builder of 32 years

See It Happen

Renovation Takeoff in Real Time — Watch the AI Work.

Upload your renovation floor plan and watch the AI detect every room, measure every surface, and calculate material quantities for each trade automatically.

app.renocalcapp.com
AI Scanning
5 rooms detected
Living Room 4.8 × 6.2m
Master Bedroom 4.2 × 5.1m
Kitchen 2.8 × 3.6m
Bathroom 2.1 × 2.8m
Bedroom 2 3.4 × 4.0m
Try It Live →
How It Works

Full Renovation Takeoff From a Floor Plan Upload.

Whether you're quoting a full house refurbishment, a kitchen extension, or a flat conversion, the material takeoff is always the hard part. How many tiles? How much paint? How many metres of pipe? RenoCalc's AI calculates all of it from the floor plan — room by room, trade by trade, in under 3 minutes.

It's the AI software for renovation quotes that works the way a QS works — methodically, from the drawings — but without the cost or the wait. Whether it's a residential extension or a commercial renovation, the takeoff is ready before you've finished your first coffee on site.

Try the Scanner Free
RenoCalc AI robot scanning a loft conversion floor plan in real time

Built by a Builder

Refurbishment Estimating Done Right — First Time, Every Time.

RenoCalc's renovation takeoff covers every trade in a refurbishment — from structural works to finishing trades — calculated from a single floor plan upload.

RenoCalc AI robot scanning a living room renovation in real time
12 trades calculated 40,000+ live formulas 5-document quote pack Under 3 minutes
RenoCalc AI scanning a living room renovation plan for automated quoting
REFURBISHMENT ESTIMATING SOFTWARE

Every Trade. Every Room. One Accurate Takeoff.

RenoCalc covers the full range of renovation trades in a single takeoff: flooring, wall tiling, plastering, painting, plumbing, heating, electrics, carpentry, roofing, landscaping, and structural. It's refurbishment estimating software that handles the whole job — not just your own trade. 32 years of renovation experience is built into every formula.

  • Materials calculated per room for all 12 renovation trades
  • Covers residential and commercial renovation estimating equally
  • Radiator sizing and BTU calculations included per room
Try the Renovation Takeoff Free
AI SOFTWARE FOR RENOVATION QUOTES

Takeoff Done. Professional Quote Ready. Client Waiting.

The renovation material takeoff feeds directly into the RenoCalc Spreadsheet — a fully itemised quote your client can review, question, and sign. The 5-document pack covers everything: schedule of works, HSE-aligned method statements for every trade, and a 12-page contract pack. It's builders admin automation software that handles the paperwork so you can get back to the job.

  • RenoCalc Spreadsheet with material costs per trade — no Excel needed
  • AI software for construction paperwork: quote, contract and method statements
  • Quote building jobs faster — from plan upload to signed contract same day
See the Full Quote Pack
AI scanning a UK hallway and staircase renovation floor plan for a free quote

The RenoCalc Advantage

Old Way vs. Smart Way

See the difference between manual renovation takeoffs and RenoCalc's automated approach.

Feature Traditional Method RenoCalc
Material takeoff time 4–6 hours manual Under 3 minutes AI
Trades covered Usually just your own All 12 renovation trades
Radiator sizing Separate BTU calculation Included per room automatically
Quote document Typed up from notes 5-document professional pack
Method statements Not included HSE-aligned, generated per trade
Contract pack Not included 12-page ready-to-sign pack

FAQs

Common Questions

What trades does the renovation material takeoff cover?
RenoCalc covers 12 renovation trades in a single takeoff: flooring, wall tiling, plastering, painting and decorating, plumbing, central heating, electrics, carpentry and joinery, roofing, landscaping, and structural works. Every quantity is calculated from your floor plan dimensions.
Does it work for house extensions?
Yes. Upload your extension floor plan and the AI will calculate materials across all relevant trades. Whether it's a single-storey kitchen extension or a full loft conversion, RenoCalc's renovation takeoff software handles it in minutes.
Can I use it for commercial renovation projects?
RenoCalc handles both residential and commercial renovation estimating. Upload your commercial floor plan and the AI will perform the same room-by-room takeoff — useful for office fit-outs, retail refurbishments, and HMO conversions.
Is this the same as refurbishment estimating software?
Yes — RenoCalc is specifically designed for renovation and refurbishment projects. Unlike general construction estimating tools that focus on new build, RenoCalc's formulas and trade calculations are built around renovation work: stripping out, making good, and fitting out across all 12 trades.
How much does the renovation takeoff software cost?
Your first quote is completely free — no credit card required. After that, it's pay-as-you-go from £9.99 per quote. A monthly subscription from £19.99 covers unlimited quotes, making it cost-effective even for busy renovation contractors.

Stop Losing Evenings
to Paperwork.

Join 1,000+ builders who quote in minutes, not hours. First quote is completely free.

Generate My First Quote Free View Pricing