Floor Plan Cost Estimator — 3-Minute Quotes | RenoCalc
Try Free — No Card Needed
AI-POWERED ESTIMATING

Floor Plan Cost Estimator — Quotes in 3 Minutes, Not 3 Hours

Upload any floor plan — architectural drawing, Rightmove listing, or hand-drawn sketch — and get a detailed renovation quote with materials, labour costs, and a shopping list. Powered by AI that actually understands construction.

~3 min
Average quote time
30+
Excel sheets per quote
150+
Countries adaptable
Designed by a builder, for real-world quoting — trusted by builders, renovators, and property professionals across the UK
17 rooms detected · 165 m² · 42 seconds

From Floor Plan to Full Quote in 3 Steps

No manual measuring. No spreadsheet formulas. No guessing quantities. Upload a plan, let the AI do the heavy lifting, and download a professional quote you can hand straight to a client or supplier.

1

Upload Your Floor Plan

Drag and drop any floor plan image or PDF. Works with architectural drawings, estate agent plans from Rightmove or Zoopla, hand-drawn sketches, and planning application documents.

Paper floor plan with tape measure and pencil — the kind of plan you upload to RenoCalc
2

AI Detects Everything

The AI analyses your plan and detects every room, door, window, and partition wall — calculating dimensions, floor areas, wall areas, and surface measurements automatically.

RenoCalc AI robot scanning a renovation room with laser measurements overlaid in cyan — 4200mm by 3800mm
3

Download Your Quote

Get a professional Excel spreadsheet with 30+ sheets: room-by-room costs, trade breakdowns, materials shopping list, labour hours, radiator calculations, and total project budget.

RenoCalc Quote Generated Successfully screen on iPhone showing Room Breakdown with Living room, Kitchen, Study, Dining, Hall, Utility, Family, Bedrooms 1-4 with dimensions and m² area

What the AI Detects From Your Floor Plan

RenoCalc uses purpose-built AI construction estimating software — not a generic chatbot — trained to understand construction drawings. One calibration measurement and it calculates everything else proportionally.

Rooms & Dimensions

Identifies every room by name and type — bedrooms, bathrooms, kitchen, hallways, utility rooms. Calculates length, width, floor area, wall area, and ceiling area for each.

Doors & Openings

Detects every door on the plan, classifying internal and external doors. Each door is logged with dimensions and room location for accurate joinery costing.

Windows & Glazing

Finds windows of all sizes, estimating dimensions from the plan. Window areas are deducted from wall surface calculations so paint and plaster quantities are precise — not inflated.

Internal Partition Walls

Identifies stud partition walls and calculates their length, height, and both-side surface area. Generates accurate plasterboard, timber, and insulation quantities automatically.

Calibrated Measurements

You provide one known room width, and the AI scales every other measurement proportionally. Achieves accuracy within 5% of manual takeoff when calibrated correctly.

Radiator & BTU Calculations

Calculates heat loss per room based on floor area, external walls, and window area. Recommends correctly sized radiators with BTU ratings for each room in the property.

A Complete Renovation Quote — Not Just a Number

RenoCalc doesn't give you a vague estimate. You get a fully detailed, editable Excel workbook with everything a builder needs to price and deliver the job. Unlike manual spreadsheets, generic estimating tools like Buildxact, or guesswork from online calculators — every figure is generated directly from your actual floor plan.

  • Room-by-Room Cost Breakdown

    Every room itemised by trade: electrics, plumbing, plastering, decorating, flooring, carpentry, tiling, and more.

  • Materials Shopping List

    Exact quantities: plasterboard sheets, cable metres, paint tins, copper pipe, skirting lengths, screws, fixings — hand it straight to your supplier.

  • Labour Hours & Costs

    Trade-specific labour rates and estimated hours per task. Adjust rates to match your area and the spreadsheet recalculates instantly.

  • Radiator Schedule

    BTU calculations per room with recommended radiator sizes. Based on floor area, external walls, and glazing.

  • Editable Excel with Live Formulas

    Not a locked PDF. Swap materials, change quantities, add your margin — formulas update the total automatically. It's your quote to customise. Perfect for builders who need professional quoting software without the learning curve.

  • 30+ Detailed Worksheets

    Separate sheets for each trade, summary sheets, schedule of works, stud partitions, MF ceilings, and project overview.

RenoCalc_Quote_3BedSemi_2026.xlsx Shopping List ▼ Summary Rooms Shopping List Plastering Electrical Plumbing Tiling Decorating Flooring Joinery Radiators TRADE MATERIAL QTY UNIT RATE (£) TOTAL (£) PLASTERING £862 Plasterboard 12.5mm 2.4×1.2m 42 sheets 12.40 520.80 Multi-finish plaster 25kg 18 bags 14.20 255.60 Angle bead 2.4m 24 lengths 3.55 85.20 ELECTRICAL £1,247 2.5mm twin & earth cable 95 m 1.85 175.75 Double socket white 28 nr 8.40 235.20 Downlight LED 6W 36 nr 9.95 358.20 PLUMBING & HEATING £2,182 15mm copper pipe 3m 22 lengths 14.85 326.70 Type 22 radiator 600×1200 6 nr 142.00 852.00 TRV chrome set 6 nr 22.50 135.00 TILING £516 Porcelain tile 600×600mm 18.4 m² 22.00 404.80 Tile adhesive 20kg 8 bags 13.90 111.20 FLOORING £2,318 Engineered oak 14mm 62 m² 34.50 2139.00 Underlay 5mm acoustic 62 m² 2.90 179.80 MATERIALS — 12 TRADES TOTAL £7,125 ▸ 142 items across 12 trades · all formulas live · adjust any cell to recalculate everything Formula cell Adjustable rate Trade subtotal Sheet 6 of 32

A real RenoCalc quote output — 30+ sheets, fully editable, with live formulas

Works With Any Floor Plan You've Got

You don't need professional architectural drawings. RenoCalc's AI handles everything from polished CAD output to a quick sketch on the back of an envelope.

Architectural Drawings

Professional CAD plans, planning application drawings, PDF or image format

Estate Agent Plans

Rightmove, Zoopla, OnTheMarket floor plans — screenshot and upload

Hand-Drawn Sketches

Quick sketches with room labels — the AI can work with rough layouts

Scanned Documents

Old paper plans, scanned PDFs, photos of printed drawings

Who Uses the Floor Plan Cost Estimator?

Whether you're quoting renovation jobs, assessing property deals, or budgeting a refurb — RenoCalc turns a floor plan into a professional cost breakdown in minutes.

Builders & Tradespeople

Stop spending evenings on manual quoting paperwork. Upload a floor plan after a site visit and have a professional quote ready in 3 minutes — not 3 hours. Win more jobs by turning quotes around faster than any competitor.

3 MIN VS 3+ HOURS

Property Developers

Found a property on Rightmove? Upload the floor plan and get a renovation budget before the viewing. Make same-day offers with confidence instead of waiting weeks for a builder to quote. Deal velocity is everything.

SAME-DAY OFFERS

Property Investors

Running buy-refurbish-refinance numbers? Get accurate refurb budgets from Zoopla floor plans to stress-test deals before committing capital. Compare multiple properties in an afternoon — not over weeks.

FASTER DUE DILIGENCE

Floor Plan Cost Estimator — Your Questions Answered

Last Updated: March 2026

Yes. RenoCalc uses AI to analyse any floor plan image — architectural drawings, estate agent plans from Rightmove or Zoopla, even hand-drawn sketches. Upload your plan, calibrate one known room width, and receive a full renovation quote with materials and labour costs in approximately 3 minutes.
RenoCalc works with architectural drawings (PDF or image), estate agent floor plans from Rightmove, Zoopla, or OnTheMarket, scanned hand-drawn sketches, and planning application drawings. The AI detects rooms, doors, windows, and partition walls from any clear plan layout.
You enter one known room dimension — for example, "Bedroom 1 is 4.35 metres wide". The AI uses this as a scale reference to calculate every other measurement on the plan proportionally. This calibration step is what makes the estimates accurate to within 5% of manual measurements.
Absolutely. Estate agent floor plans from Rightmove, Zoopla, and OnTheMarket are some of the most common plan types uploaded to RenoCalc. Property developers use this workflow to estimate renovation costs before making offers — getting a budget figure the same day a property is listed.
When calibrated with a known room dimension, RenoCalc's AI achieves measurement accuracy within 5% of manual takeoff. The quote uses real UK trade material prices and labour rates. However, estimates are for budgeting purposes — always verify dimensions on-site before committing to a final price.
Yes. RenoCalc outputs a fully editable Excel spreadsheet with live formulas. You can adjust quantities, swap materials, change labour rates, add your profit margin, and the totals recalculate automatically. It's your quote — the AI just does the heavy lifting.
The current version is optimised for renovation and refurbishment projects — full house renovations, HMO conversions, buy-to-let refurbs. RenoCalc PRO (coming soon) will add dedicated flows for new builds, extensions, and loft conversions with structural calculations.
That's one of the most popular use cases. Property developers and investors upload Rightmove or Zoopla floor plans to get a renovation budget within minutes — enabling same-day offers instead of waiting weeks for a builder to quote. It's a significant competitive advantage in fast-moving property markets.
PS

Pindi Sahota — Builder & Founder of RenoCalc

Pindi is a builder by trade who built RenoCalc to solve his own problem: spending evenings doing manual quoting paperwork instead of being with his family. RenoCalc now helps builders and property developers across the UK generate professional renovation quotes in minutes, not hours.

Ready to Quote Faster Than Any Competitor?

Upload your floor plan and get a detailed renovation quote in 3 minutes. Your first quote is free.

Try RenoCalc Free — Upload a Floor Plan