Floor Plan Quote Software for UK Builders | RenoCalc Skip to main content
Try Free Now
AI-Powered · UK Builders · Free to Try

Floor Plan Quote Software
That Thinks Like a Builder.

Upload any floor plan — architect's drawing, estate agent PDF, hand sketch — and RenoCalc's floor plan quote software detects every room, calculates every dimension, and generates a complete professional quote pack in under 3 minutes.

Get My Free Quote

No credit card needed  ·  First quote completely free  ·  From £9.99/quote thereafter

★★★★★ 4.9/5 from 200+ builders
✓ 1,000+ UK builders using RenoCalc
✓ No software to install

See It Happen

Upload a Floor Plan. Watch the AI Measure Every Room.

RenoCalc's floor plan quote software analyses your uploaded plan in real time — detecting walls, rooms, doors, and windows before building a complete cost breakdown across 12 trades.

How It Works

From Floor Plan to Professional Quote in 3 Minutes.

You upload the plan — a photo, a PDF, a scan — and the AI does the rest. It reads the layout, maps every room, calculates all the dimensions, and builds a full trade-by-trade cost breakdown without you touching a tape measure or a calculator.

What used to take 4–6 hours of manual measuring, pricing, and typing now takes under 3 minutes. And the output isn't a rough estimate — it's a complete, professional quote pack your client can sign on the spot.

Try the Scanner Free
RenoCalc floor plan quote software detecting rooms and calculating dimensions

Built by a Builder

The AI Reads the Floor Plan. You Win the Job.

After 32 years on the tools, Pindi Sahota built the floor plan quote software he always wished existed — one that handles the numbers so builders can focus on the work.

AI robot using RenoCalc floor plan quote software to scan a living room renovation
Any floor plan format 12 trades calculated 40,000+ live formulas 5-document quote pack Under 3 minutes
Builder uploading a floor plan to RenoCalc floor plan quote software on a phone
No More Site Visits Just to Measure

Quote the Job Before You've Even Been on Site.

Got an estate agent's floor plan PDF? A photo of the architect's drawing? Upload it to RenoCalc and the AI handles every measurement. No tape measure, no clipboard, no second visit just to price up.

For refurbs, extensions, and full renovations, this means you can get a professional quote in front of the client the same day you receive the floor plan — before your competition has even booked in a site visit.

  • Works with architect's drawings, estate agent PDFs, hand sketches, and site photos
  • Room-by-room breakdown — review and adjust any dimension before generating the quote
  • Full 12-trade cost breakdown generated automatically from the floor plan data
Try It Free
Professional Output

A Complete 5-Document Pack That Closes the Deal.

RenoCalc doesn't just give you a number — it generates a complete quote pack that looks and reads like it came from a top-tier firm. The RenoCalc Spreadsheet contains 40,000+ live formulas covering every trade. Add the cover letter, schedule of works, method statements, and contract pack, and you hand the client everything they need to say yes.

Most builders spend an evening typing quotes. With floor plan quote software, you're done before you've had your second cup of tea. See full pricing from £9.99.

  • RenoCalc Spreadsheet with 40,000+ live formulas across 12 trades
  • HSE-aligned method statements and a 12-page contract pack included
  • Radiator BTU sizing calculated per room — automatically, from the floor plan dimensions
See the 5 Documents
Floor plan quote software output — 5-document renovation pack ready to present to a client
Builder photographing an estate agent floor plan with a phone to generate a quote with RenoCalc
ANY FLOOR PLAN, ANY SOURCE

Rightmove PDF, Hand Sketch, or Architect's CAD — It Doesn't Matter.

Most floor plan quote software on the market only works cleanly with one type of input — a tidy CAD export, usually. RenoCalc's AI was trained on the messier reality of what actually lands in a builder's inbox: a Rightmove or Zoopla listing PDF, a photo of a hand-drawn sketch the homeowner did on the back of an envelope, a scanned architect's drawing from a previous extension, or a screenshot from a WhatsApp message.

If a room outline and at least one known dimension are visible, the AI can calibrate the scale and read the rest of the plan from there. You don't need to redraw anything, trace over the image, or convert file formats before you upload.

  • Estate agent PDFs from Rightmove, Zoopla or OnTheMarket listings
  • Architect's CAD drawings, scanned plans, and hand-drawn sketches
  • No file conversion, no tracing, no redrawing required
Upload Any Floor Plan
WHAT THE CLIENT SEES

A Quote Pack That Makes the Decision Easy.

Homeowners choosing a builder are usually comparing a handful of quotes side by side, and the one that's easiest to understand and hardest to fault often wins — even against a slightly cheaper number scribbled on the back of a business card. A RenoCalc quote pack gives them an itemised spreadsheet they can actually read, a proper cover letter with your details, a schedule showing when each phase happens, and a contract ready to sign.

That's a very different conversation to handing over a single lump-sum figure and hoping they trust you. When a client can see exactly what they're paying for — trade by trade, room by room — objections tend to disappear before they're raised.

  • Itemised, trade-by-trade breakdown the client can actually follow
  • Fewer price objections when every cost is explained upfront
  • A contract ready to sign the same day the quote is accepted
See a Sample Quote Pack
Homeowners reviewing a printed renovation quote pack from a builder at their kitchen table

Same-Day Turnaround

From Inbox to Quote, the Same Afternoon.

Here's what a typical floor plan quote software turnaround looks like with RenoCalc, versus the traditional manual route.

StepTraditional RouteRenoCalc
Receive floor plan from clientSame daySame day
Book and attend a site visit to measure2–5 days' wait, 1–2 hours on siteNot required to produce the quote
Calculate quantities and cost per trade2–4 hours at a desk or kitchen tableUnder 3 minutes, automatic
Type up cover letter and quote document30–60 minutesGenerated automatically
Total time to a sendable quote3–6 daysSame afternoon

That gap matters commercially, not just for convenience. A homeowner who receives a professional quote within hours of sending the floor plan is far less likely to have moved on to a competitor by the time a traditional site-visit-first process would even have started.

The RenoCalc Advantage

Old Way vs. Smart Way

Most builders still measure up manually and price from memory. Here's how RenoCalc's floor plan quote software changes every part of that process.

Feature Manual Quoting RenoCalc
Floor plan measurement Manual site visit with tape measure AI reads any floor plan image instantly
Time to produce a quote 4–6 hours manual calculation Under 3 minutes
Trades covered Your trade only, from memory 12 trades, all calculated automatically
Radiator sizing Rough guesswork or manual BTU calc Auto-calculated per room from floor plan data
Contract and method statements Not included — sourced separately HSE-aligned, included in every pack
Quote formats accepted Only what you remember from site Any floor plan: PDF, photo, sketch, drawing

FAQs

Common Questions

Floor plan quote software automatically reads the dimensions from a floor plan image — whether it's an architect's drawing, estate agent PDF, or a hand sketch — and uses those measurements to calculate a complete renovation quote. RenoCalc's AI detects every room, door, and window, then builds a full breakdown across 12 trades, covering labour, materials, and radiator sizing, without you doing a single manual calculation.
RenoCalc's floor plan quote software works with virtually any floor plan format. You can upload architect's drawings, estate agent property PDFs, scanned hand-drawn plans, or even photographs of plans taken on site. The AI is trained to handle scaled drawings, unscaled sketches, and everything in between — you're not limited to pristine CAD-quality files.
The AI analyses the uploaded image, identifies walls, rooms, doors, and windows using computer vision, and calculates room dimensions from the plan's scale or by inference from standard construction geometry. Results are displayed room-by-room so you can review, correct, or adjust any measurement before the quote is generated. You stay in control throughout.
Once the floor plan is scanned, RenoCalc generates a full 5-document quote pack: a trade-by-trade cost breakdown with 40,000+ live formulas in the RenoCalc Spreadsheet, a professional cover letter, a full schedule of works, HSE-aligned method statements for every trade, and a 12-page contract pack ready to sign. Everything a client needs to say yes is in one pack.
Absolutely. Many builders use RenoCalc after a site visit — they photograph the estate agent's floor plan brochure, upload it, and let the AI handle the measuring. Others use architect's drawings from planning applications. Whether it's a new instruction or a job you've already seen, the process is the same: upload the plan, review the rooms, generate the quote.
Your first quote is completely free — no credit card needed. After that, RenoCalc is pay-as-you-go from £9.99 per quote, or unlimited quotes on a monthly subscription from £19.99/month. See the full pricing page for all options.
Yes. Floor plans uploaded to RenoCalc are processed securely and are never shared with third parties. Your quote data, client details, and uploaded plans remain private to your account. See the privacy policy for full details.
No installation required. RenoCalc runs entirely in your web browser on desktop, tablet, or phone. There is also an Android app on Google Play for builders who prefer to work from their phone on site.

Related Questions

People Also Ask

What if my floor plan doesn't have any dimensions written on it?
You provide one known measurement — usually a room width you can confirm from memory or a quick check — and the AI uses it to calibrate the scale for the entire drawing. Most estate agent floor plans include at least one labelled dimension; for completely unlabelled sketches, any measurement you're confident about works as the reference point. Once that single figure is set, every other room, wall and opening on the plan is scaled proportionally from it, so one accurate measurement is enough to calibrate the whole drawing.
Can floor plan quote software price an extension, not just a renovation?
Yes. Upload the proposed floor plan for the extension (from the architect's planning drawings) alongside the existing layout if relevant, and RenoCalc calculates the quantities for the new build area the same way it would for an internal renovation — across all 12 trades, including the additional groundworks and structural elements an extension typically needs.
How is floor plan quote software different from a generic online cost calculator?
Generic calculators ask for a single total square footage and apply an average cost-per-square-metre multiplier — the same rate whether that space is an open-plan kitchen-diner or three small box rooms. RenoCalc reads every room individually from your actual floor plan, so the quote reflects the real layout, not an average.
Do I need a subscription to use floor plan quote software, or can I pay per job?
Both options are available. RenoCalc is pay-as-you-go from £9.99 per quote, which suits builders who quote occasionally, or a monthly subscription from £19.99 for unlimited quotes, which works out cheaper for anyone quoting more than two jobs a month. Your first quote is free either way.
Will the quote change if I upload a better-quality floor plan later?
Yes — you can re-upload a clearer or more detailed floor plan at any time and generate a fresh quote from it. Many builders start with a quick estate agent PDF to give a client a same-day ballpark, then re-run the quote once the architect's full drawings are available for a more precise final figure.
Can I use floor plan quote software for multiple properties at once, like a landlord or investor would?
Yes. Landlords, property investors and developers pricing several units — a block of flats being refurbished, or a run of similar houses on one street — commonly upload each floor plan separately and build a set of comparable quotes in the same afternoon, rather than waiting on a single quantity surveyor to work through them one at a time. Each property gets its own dedicated RenoCalc Spreadsheet, so quantities and costs never get mixed up between units when you're managing a portfolio of quotes side by side.

Next Floor Plan You Receive —
Quote It Before You've Made a Brew.

Upload the plan. The AI measures every room. You get a complete 5-document quote pack in under 3 minutes. First quote is free.

Generate My First Quote Free View Pricing