AI Floor Plan Scanner — Quote in 3 Minutes | RenoCalc
Try Free Now
AI FLOOR PLAN SCANNER

AI Floor Plan Scanner.
Upload Any Floor Plan —
Quotes Your Whole Job in 3 Minutes.

Quick Answer

RenoCalc's AI floor plan scanner analyses any floor plan image — estate agent PDFs, architect drawings, Rightmove plans, photos, or hand sketches — and automatically detects every room, measures internal dimensions, and identifies doors, windows, and partitions. From a single floor plan upload, it generates a complete trade-by-trade renovation quote in under 3 minutes.

Upload any floor plan image — architect's drawing, estate agent PDF, hand sketch — and RenoCalc's AI automatically reads every room, calculates dimensions, and generates a trade-by-trade renovation quote. No tape measure. No manual entry.

Get My Free Quote

No credit card needed  ✦  First quote completely free  ✦  Built by a builder of 32 years

See It Happen

Upload a Floor Plan. Watch the AI Measure Every Room.

See RenoCalc scan a real floor plan — detecting rooms, measuring dimensions, and building a full quote in real time.

app.renocalcapp.com — AI Floor Plan Scanner
AI Scanning
5 rooms detected
Living Room4.8 × 6.2m
Master Bedroom4.2 × 5.1m
Kitchen2.8 × 3.6m
Bathroom2.1 × 2.8m
Bedroom 23.4 × 4.0m
Try It Live →
How It Works

Three minutes from floor plan to professional quote.

Most builders spend 4–6 hours per quote — pulling out the tape measure, calculating room by room, looking up material costs. RenoCalc does all of that in under 3 minutes. Upload any floor plan image and the AI reads every room automatically.

The scanner detects room dimensions, wall lengths, perimeters, windows, doors, stud partitions, electrical points, plumbing points, bathroom furniture, and more — real measurements from the drawing, not guesswork. Radiator sizing and BTU loads are calculated from room dimensions using standard heat-loss assumptions; for full accuracy, confirm insulation and glazing on-site before finalising.

Try the Scanner Free
RenoCalc AI scanning a floor plan and detecting rooms in real time

Built by a Builder

The AI Does the Measuring. You Win the Job.

RenoCalc's AI floor plan scanner reads your drawing and calculates every trade from first principles — so you spend your time quoting, not measuring.

AI robot scanning a living room using the RenoCalc floor plan scanner
12 trades calculated 40,000+ live formulas 5-document quote pack Under 3 minutes
Builder using an AI floor plan scanner on a phone to generate a renovation quote
NO TAPE MEASURE NEEDED

Scan Once. Quote Everything.

Upload any floor plan — architect's drawing, estate agent PDF, or a photo of a hand sketch — and RenoCalc measures every room automatically. What used to take hours of manual measurement is done in seconds.

  • Detects room dimensions, perimeters and wall lengths automatically
  • Works with architect drawings, estate agent PDFs and hand sketches
  • No manual measurement entry — the AI does it all
Try It Free
PROFESSIONAL OUTPUT

From Floor Plan to 5-Document Quote Pack.

Once the AI scans your floor plan, RenoCalc generates a complete 5-document quote pack: a RenoCalc Spreadsheet with 40,000+ live formulas, a branded cover letter, a phased schedule of works, HSE-aligned method statements, and a 12-page ready-to-sign contract pack.

  • RenoCalc Spreadsheet with live, editable formulas across 12 trades
  • Branded cover letter and phased schedule of works included
  • HSE-aligned method statements and 12-page contract pack
See the 5 Documents
Complete 5-document professional quote pack generated by RenoCalc AI floor plan scanner

The RenoCalc Advantage

Old Way vs. Smart Way

See how RenoCalc's AI floor plan scanner compares to spending your evenings on manual takeoffs.

FeatureTraditional QuotingRenoCalc
Time to produce a quote4–6 hours manualUnder 3 minutes
Room measurementsManual tape measureAI reads from floor plan
Materials shopping listMemory or guessworkAuto-generated, itemised
Trades coveredOnly your own trade12 trades in one quote
Method statementsNot includedHSE-aligned, every trade
Contract packNot included12-page ready-to-sign pack

FAQs

Common Questions

How does the AI floor plan scanner work?
You upload a floor plan image — JPG, PNG, or PDF. RenoCalc's AI analyses the drawing, identifies each room by its shape and label, measures the dimensions, and feeds those measurements into a full trade-by-trade estimate covering plastering, electrics, plumbing, tiling, flooring, decorating, and joinery. The whole process takes under 3 minutes.
What types of floor plan images can I upload?
RenoCalc accepts architect's drawings, estate agent floor plan PDFs, photographs of hand-drawn sketches, and digital drawings. The AI is trained on thousands of real floor plan styles. As long as the rooms are clearly outlined, the scanner will detect them.
How accurate is the AI floor plan scanning?
The scanner is highly accurate for standard residential floor plans. It reads wall lengths, room dimensions, and perimeters from the drawing. You can also review and adjust any room on the Rooms Input sheet before downloading your quote — so your final output is always site-verified.
Does the scanner work with estate agent floor plans?
Yes — estate agent floor plans are one of the most common uploads. Property investors use RenoCalc to scan an estate agent PDF, generate a renovation budget, and have a cost figure ready before the viewing ends. The AI handles the scale automatically.
Can I correct the AI's room measurements?
Absolutely. Every quote downloads as a fully editable RenoCalc Spreadsheet with a dedicated Rooms Input sheet. Update any dimension and every trade formula recalculates instantly — so you can start with the AI scan and refine it with your own site measurements.

People Also Ask

Related Questions About AI Floor Plan Scanning

Can the AI floor plan scanner read Rightmove floor plans?
Yes. Rightmove floor plans are among the most commonly uploaded file types. Property investors upload Rightmove PDFs to get a renovation budget before or during a viewing. The AI reads the plan scale automatically — no manual calibration required for standard Rightmove formats.
What happens after the floor plan is scanned?
Once the scan is complete, RenoCalc generates a 5-document quote pack: a RenoCalc Spreadsheet with 40,000+ live formulas across 12 trades, a branded cover letter, a phased schedule of works, HSE-aligned method statements, and a 12-page ready-to-sign contract pack. All in under 3 minutes.
How is RenoCalc's floor plan scanner different from generic AI tools?
Generic AI tools like ChatGPT cannot read floor plans, measure rooms, or apply construction rates. RenoCalc is purpose-built — it performs visual analysis of floor plan images, extracts actual dimensions, applies UK trade rates and material costs, and outputs a full Excel workbook. See our full comparison in the AI construction estimating explainer.
Does the AI floor plan scanner work for commercial properties?
Yes. RenoCalc handles residential renovations, commercial fit-outs, extensions, and loft conversions. The AI detects rooms and spaces regardless of whether the building is a house or commercial unit, as long as the floor plan clearly delineates the room boundaries.
Do I need to install software to use the floor plan scanner?
No installation required. RenoCalc's AI floor plan scanner runs in your browser at app.renocalcapp.com. An Android app is also available on Google Play. Upload a floor plan, get your quote — no setup, no spreadsheet templates, no learning curve. Try it free here.

Stop Losing Evenings
to Spreadsheets.

Join 1,000+ builders who quote in minutes, not hours. First quote is free.

Generate My First Quote Free View Pricing