AI-Powered Renovation Quotes
That Win You More Jobs.
The only AI that reads a floor plan and generates a complete professional quote pack — not just a rough figure. RenoCalc Spreadsheet with 40,000+ live formulas, branded cover letter, phased schedule of works, HSE-aligned method statements, and a 12-page contract pack.
Get My Free QuoteNo credit card needed ✦ First quote completely free ✦ Built by a builder of 32 years
See It Happen
See AI-Powered Renovation Quotes Being Generated Live.
Watch RenoCalc's AI scan a floor plan and generate a full professional quote pack in real time — trade by trade, room by room.
From a floor plan image to a winning quote in under 3 minutes.
AI-powered renovation quotes aren't just about speed — they're about accuracy. RenoCalc reads actual room dimensions from your floor plan, applies UK labour and material rates across 12 trades, and produces a professional 5-document pack that clients take seriously.
Upload any floor plan — architect's drawing, estate agent PDF, or hand sketch — and the AI handles every measurement, every calculation, and every document. You review, adjust if needed, and send.
Try It Free
Built by a Builder
AI That Quotes Like a Builder.
RenoCalc's AI was trained on real renovation jobs — it quotes the way a 32-year industry veteran would, not the way a generic algorithm would.


AI Quotes Based on Your Actual Dimensions.
Generic AI tools produce average-based estimates. RenoCalc reads your actual floor plan dimensions — every room, every wall, every measurement — and builds a bespoke quote from those real numbers. The result is an AI-powered renovation quote that holds up on site.
- AI reads real room dimensions from your floor plan
- Calculates material quantities from actual measurements, not averages
- Trade-by-trade breakdown across 12 trades per room
Not Just a Quote. A Full Professional Pack.
Every AI-powered renovation quote from RenoCalc includes five documents: a RenoCalc Spreadsheet with 40,000+ live formulas, a branded cover letter, a phased schedule of works, HSE-aligned method statements for every trade, and a 12-page ready-to-sign contract pack. That's what separates a winning quote from a rough figure.
- RenoCalc Spreadsheet — 40,000+ live formulas, editable on the fly
- Branded cover letter + phased schedule of works
- HSE method statements + 12-page contract pack

The RenoCalc Advantage
Old Way vs. Smart Way
See how AI-powered renovation quotes from RenoCalc compare to traditional manual quoting methods.
| Feature | Traditional Quoting | RenoCalc |
|---|---|---|
| Time to produce a quote | 4–6 hours manual | Under 3 minutes |
| Measurement accuracy | Human error likely | AI reads from floor plan |
| Trades covered | Your trade only | 12 trades in one quote |
| Method statements | Not included | HSE-aligned, every trade |
| Contract pack | Not included | 12-page ready-to-sign pack |
| Quote professionalism | Rough or basic | Professional 5-document pack |
FAQs
Common Questions
Stop Losing Evenings
to Spreadsheets.
Join 1,000+ builders who quote in minutes, not hours. First quote is free.
Generate My First Quote Free View Pricing