The AI Renovation Software UK
Builders Have Been Waiting For.
Quick Answer
RenoCalc is UK AI renovation software for builders and contractors. Upload a floor plan and receive a complete renovation quote pack in under 3 minutes: a fully-formulated cost spreadsheet, professional cover letter (free), schedule of works, HSE-aligned method statements for 12 trades, and a 12-page building contract pack.
Built by a working UK builder with 32 years on the tools — not a software company. RenoCalc's AI renovation software reads your floor plan, calculates every trade from first principles, and delivers a professional quote pack in under 3 minutes.
Get My Free QuoteNo credit card needed ✦ First quote completely free ✦ Built by a builder of 32 years
See It Happen
See the UK's Leading AI Renovation Software in Action.
Watch RenoCalc scan a real floor plan and generate a full professional quote — the AI renovation software UK builders are switching to.
Scan a floor plan. Get a quote. Win the job.
Traditional quoting software makes you do the work — entering measurements, looking up rates, typing figures. RenoCalc's AI does it for you. Upload a floor plan and the software reads every room, calculates every trade, and produces a professional 5-document quote pack in under 3 minutes.
Built specifically for the UK market — with UK material costs, UK labour rates, UK compliance documents (HSE method statements, 12-page contract pack), and support for over 150 country localisations for international projects.
Try the Software Free
Built by a Builder
UK-Built AI. UK Labour Rates. UK-Ready Documents.
RenoCalc is the AI renovation software built from the ground up for the UK construction industry — by a builder who's spent 32 years on UK sites.


UK Labour Rates, UK Compliance, UK Results.
RenoCalc is built around UK material costs and labour rates, with HSE-aligned method statements and a 12-page UK-standard contract pack included in every quote. It's not a generic tool repurposed for the UK — it was designed here, for here, from day one.
- UK labour rates and material costs built into every calculation
- HSE-aligned method statements for all 12 trades
- 12-page UK-standard contract pack generated automatically
One Upload. Five Professional Documents.
Every RenoCalc quote generates a complete 5-document pack: a RenoCalc Spreadsheet with 40,000+ live formulas covering 12 trades, a branded cover letter, a phased schedule of works, HSE-aligned method statements for every trade, and a ready-to-sign 12-page contract pack. No other AI renovation software in the UK comes close.
- RenoCalc Spreadsheet — 40,000+ live formulas, 12 trades
- Branded cover letter + phased schedule of works
- HSE method statements + 12-page contract pack

The RenoCalc Advantage
Old Way vs. Smart Way
See why RenoCalc is the AI renovation software UK builders are switching to — and what they're switching away from.
| Feature | Traditional UK Software | RenoCalc |
|---|---|---|
| Floor plan scanning | Manual entry only | AI reads from floor plan |
| UK labour rates | Manual lookup required | Built in by default |
| Trades covered | Your trade only | 12 trades in one quote |
| HSE method statements | Not included | Every trade, every quote |
| Contract pack | Not included | 12-page ready-to-sign pack |
| Time to produce a quote | 4–6 hours manual | Under 3 minutes |
FAQs
Common Questions
Related Questions
People Also Ask
Stop Losing Evenings
to Spreadsheets.
Join 1,000+ builders who quote in minutes, not hours. First quote is free.
Generate My First Quote Free View Pricing