Get a Free Renovation Quote UK
Builders Actually Trust.
Upload a floor plan. Get a professional quote pack — RenoCalc Spreadsheet, branded cover letter, schedule of works, method statements, and contract pack — in under 3 minutes. First quote is completely free.
Get My Free QuoteNo credit card needed ✦ First quote completely free ✦ Built by a builder of 32 years
See It Happen
Upload a Floor Plan. Get a Free Quote in 3 Minutes.
Watch RenoCalc scan a floor plan and generate a complete, professional free renovation quote — trade by trade, room by room.
Your first free renovation quote, ready before you leave the viewing.
Most builders spend half an evening producing a quote — checking measurements, looking up material costs, typing up figures. RenoCalc cuts that to under 3 minutes. Your first quote is completely free, no card required.
Upload any floor plan — architect's drawing, estate agent PDF, or a hand sketch — and the AI measures every room, calculates every trade, and produces a 5-document professional quote pack automatically.
Get Your Free Quote
Built by a Builder
The Fastest Free Renovation Quote in the UK.
Scan a floor plan, get a full renovation quote — completely free on your first use. No card, no commitment, no faff.


Your First Renovation Quote Costs Nothing.
RenoCalc's first quote is free — no credit card, no trial period, no monthly fee to unlock it. Upload a real floor plan from a live job and see exactly what you get before deciding whether to continue.
- First quote completely free — no card required
- No trial period — your free quote is a real, downloadable quote
- Covers all 12 trades in a single free renovation quote
Not a Ballpark. A Full 5-Document Quote Pack.
Your free renovation quote isn't a rough figure — it's a complete professional pack. You get a RenoCalc Spreadsheet with 40,000+ live formulas, a branded cover letter, a phased schedule of works, HSE-aligned method statements for every trade, and a ready-to-sign 12-page contract pack.
- RenoCalc Spreadsheet — live formulas across 12 trades, fully editable
- Branded cover letter and phased schedule of works
- HSE-aligned method statements + 12-page contract pack

The RenoCalc Advantage
Old Way vs. Smart Way
See what you get with a free renovation quote from RenoCalc vs. the hours you currently spend producing one manually.
| Feature | Traditional Quoting | RenoCalc |
|---|---|---|
| Time to produce a quote | 4–6 hours manual | Under 3 minutes |
| First quote cost | Hours of your own time | Completely free |
| Materials shopping list | Memory or guesswork | Auto-generated, itemised |
| Trades covered | Only your own trade | 12 trades in one quote |
| Method statements | Not included | HSE-aligned, every trade |
| Contract pack | Not included | 12-page ready-to-sign pack |
FAQs
Common Questions
Stop Losing Evenings
to Spreadsheets.
Join 1,000+ builders who quote in minutes, not hours. First quote is free.
Generate My First Quote Free View Pricing