Material Takeoff Software — From Floor Plan | RenoCalc
Try Free Now
MATERIAL TAKEOFF SOFTWARE

Material Takeoff Software. Stop Counting by Hand —
Automated From Floor Plan in 3 Minutes.

RenoCalc is material takeoff software built for UK builders and contractors. Upload any floor plan — PDF, image or architect's drawing — and get a room-by-room materials list across 12 trades in under 3 minutes. No manual counting, no guesswork, no lost evenings.

Get My Free Quote

No credit card needed  ✦  First quote completely free  ✦  Built by a builder of 32 years

See It Happen

Upload a Floor Plan. Watch the AI Count Every Material.

The AI scans your drawing, detects every room, measures dimensions, and builds a complete material list in real time — the same way a quantity surveyor would, but in minutes.

app.renocalcapp.com
AI Scanning
5 rooms detected
Living Room 4.8 × 6.2m
Master Bedroom 4.2 × 5.1m
Kitchen 2.8 × 3.6m
Bathroom 2.1 × 2.8m
Bedroom 2 3.4 × 4.0m
Try It Live →
How It Works

Three Minutes From Floor Plan to Complete Materials List.

Most builders spend 4–6 hours manually working out what materials they need. Measuring walls, counting tiles, estimating paint quantities, figuring out how many sheets of plasterboard — all from memory or rough notes. RenoCalc's floor plan OCR software reads the plan for you and calculates every quantity automatically.

Whether you're doing residential estimating for a full house refurbishment or commercial renovation work across multiple floors, the AI adapts to the plan in front of it. It's digital takeoff software UK builders can actually use — no training required, no manual tracing, just upload and go.

Try the Scanner Free
RenoCalc AI robot scanning a living room renovation in real time

Built by a Builder

The AI Does the Measuring. You Price the Job.

Watch the AI read a floor plan and pull material quantities for every trade — flooring, tiling, plastering, painting, plumbing, electrics and more.

RenoCalc AI robot scanning a loft conversion floor plan in real time
12 trades calculated 40,000+ live formulas 5-document quote pack Under 3 minutes
RenoCalc AI scanning a kitchen renovation floor plan for material takeoff
NO MORE MANUAL COUNTS

An Itemised Materials List Across 12 Trades — Automatically.

Upload your floor plan and get a complete material takeoff covering every trade you quote for. Flooring, tiling, plastering, painting, plumbing, electrics, carpentry — all calculated from the floor plan geometry, not from memory. What used to take half a day now takes 3 minutes. RenoCalc is the construction pricing engine that feeds directly into your quote pack.

  • Quantities calculated per room from floor plan dimensions
  • 12 trades covered in one takeoff — no separate tools needed
  • Materials list included in your 5-document professional quote pack
Try It Free
PROFESSIONAL OUTPUT

Your Material List Becomes a Quote Pack the Client Can Sign.

The material takeoff feeds directly into the RenoCalc Spreadsheet — a fully itemised quote your client can review and sign. The 5-document pack includes a schedule of works, HSE-aligned method statements per trade, a 12-page contract pack, and a cover letter. It's AI software for construction paperwork that handles everything from building estimate to final contract.

  • RenoCalc Spreadsheet with itemised material costs per trade
  • HSE-aligned method statements generated for every trade
  • 12-page contract pack auto-generated — ready to sign on site
See the 5 Documents
RenoCalc AI scanning a living room renovation plan for automated quoting

The RenoCalc Advantage

Old Way vs. Smart Way

Here's what changes when you replace manual material counting with RenoCalc's automated takeoff software.

Feature Traditional Method RenoCalc
Time to complete a material takeoff 4–6 hours by hand Under 3 minutes
Quantities for 12 trades Manual or guesswork Calculated from floor plan
Materials shopping list Memory or spreadsheet notes Auto-generated, itemised by room
Radiator sizing Manual BTU calculations Calculated per room automatically
Method statements Not included HSE-aligned, every trade
Contract pack Not included 12-page ready-to-sign pack

FAQs

Common Questions

What is material takeoff software?
Material takeoff software reads a floor plan or set of drawings and calculates the quantities of materials needed for a construction or renovation project. RenoCalc uses AI to do this from a PDF floor plan in under 3 minutes — covering flooring, tiling, plastering, painting, plumbing, electrics and 6 more trades automatically.
Can RenoCalc do a takeoff from a PDF floor plan?
Yes. Upload any PDF floor plan and RenoCalc's AI will scan it, detect rooms, measure dimensions, and generate a complete material list. It works on hand-drawn plans, architect's drawings, and estate agent PDFs — making it practical building estimate from PDF plans software for everyday builders.
Does it work for residential and commercial renovation projects?
RenoCalc handles residential estimating software use cases — extensions, full refurbs, kitchen and bathroom renovations — as well as commercial renovation estimating. The AI adapts to the plan in front of it and covers all 12 renovation trades in one pass.
Is this the same as digital takeoff software?
Traditional digital takeoff software requires you to manually trace over a plan on screen to measure areas. RenoCalc goes further — it reads the plan automatically using AI, so there's no manual tracing at all. It's closer to what a quantity surveyor does, but done in minutes rather than days.
How much does it cost?
Your first quote is completely free — no credit card required. After that, it's pay-as-you-go from £9.99 per quote, or a subscription from £19.99/month for builders doing regular work. Much less than an hour of your time spent counting materials manually.

Stop Losing Evenings
to Paperwork.

Join 1,000+ builders who quote in minutes, not hours. First quote is completely free.

Generate My First Quote Free View Pricing