Local Renovation Quoting Software
Made for UK Builders.
The quoting software built specifically for local UK builders — not big corporates, not software companies. Scan a floor plan. Get a full trade-by-trade quote. Win more jobs without spending your evenings on spreadsheets.
Get My Free QuoteNo credit card needed ✦ First quote completely free ✦ Built by a builder of 32 years
See It Happen
See Your Local Quoting Software in Action.
Watch RenoCalc scan a floor plan and build a full local builder's quote — trade by trade, room by room, in under 3 minutes.
Built for the local builder. Not a software company.
Local renovation quoting software should work the way local builders work — fast, practical, and producing quotes that win jobs. RenoCalc was built by a working UK builder with 32 years on the tools, which is why it covers the real trades, produces real documents, and costs nothing to try.
Upload a floor plan from a client — architect's drawing, estate agent PDF, or a photo of a sketch — and have a professional 5-document quote ready to send before your competitors have opened their laptop.
Try the Software Free
Built by a Builder
Built by a Builder. Used by 1,000+ Local Builders.
RenoCalc is trusted by sole traders and small building firms across the UK — the local renovation quoting software that levels the playing field with larger contractors.


Stop Losing Evenings to Spreadsheets.
If you're quoting 3–5 jobs a week, that's up to 30 hours spent on admin — before you've swung a hammer. RenoCalc cuts each quote from 4–6 hours to under 3 minutes. That's a full working week saved every month.
- Quote any renovation job in under 3 minutes from the floor plan
- Cover all 12 trades in one quote — no subcontractor inputs needed
- Send professional documents that win more local contracts
Quote Like a Big Firm. Stay a Local Builder.
RenoCalc gives local builders access to the same professional quoting output as large contractors — RenoCalc Spreadsheet with 40,000+ live formulas, branded cover letter, phased schedule of works, HSE-aligned method statements, and a 12-page contract pack — without needing a quantity surveyor or estimating team.
- RenoCalc Spreadsheet — 40,000+ live formulas covering all 12 trades
- Your branding on every cover letter and quote document
- 12-page contract pack — ready to sign, every time


Win the Job While You're Still on the Doorstep.
Most homeowners get three quotes before choosing a builder, and the first professional one to land often wins — regardless of price. If you tell a client "I'll email that over in a few days," you've already handed the job to whoever replies first. RenoCalc changes that: scan the floor plan on your phone during the site visit, and you can talk them through a full trade-by-trade breakdown before you've left the driveway.
That speed matters more for local builders than for big regional firms. A national contractor can afford to lose a job to slow admin because their pipeline is large enough to absorb it. A sole trader or two-man outfit competing on reputation and word of mouth in one town or postcode area can't — the next quote that lands in that homeowner's inbox might be from the builder down the road.
- Scan a floor plan and quote from your phone, on site, in front of the client
- Be first to respond — the quote that arrives fastest wins more often than the cheapest one
- Look as organised as a national contractor without their overheads
UK-Wide Coverage
Built for Every Corner of the UK.
"Local" doesn't mean limited. RenoCalc works the same way whether you're quoting a terrace in Coventry or a barn conversion in the Highlands — the AI reads the floor plan, not the postcode.

RenoCalc is used by sole traders and small building firms across England, Scotland, Wales and Northern Ireland — from dense city terraces to rural conversions. The material and labour rates built into every quote reflect current UK averages, and because every figure downloads as a live, editable spreadsheet, you can tune any rate to your own local pricing before it goes to the client — London day rates look nothing like rates in the North East, and RenoCalc doesn't force you to pretend otherwise. We've also published detailed local cost guides for Birmingham, London, Manchester and Leeds, so you can benchmark your own numbers against real regional pricing before you quote.
The RenoCalc Advantage
Old Way vs. Smart Way
See how RenoCalc compares to the way most local builders currently produce renovation quotes.
| Feature | Traditional Quoting | RenoCalc |
|---|---|---|
| Time to produce a quote | 4–6 hours manual | Under 3 minutes |
| Measurement method | Tape measure on site | AI reads from floor plan |
| Trades covered | Your trade only | 12 trades in one quote |
| Method statements | Not included | HSE-aligned, every trade |
| Contract pack | Not included | 12-page ready-to-sign pack |
| Mobile-friendly | Desktop only | Android app + mobile web |
FAQs
Common Questions
Stop Losing Evenings
to Spreadsheets.
Join 1,000+ builders who quote in minutes, not hours. First quote is free.
Generate My First Quote Free View Pricing