AI Renovation Quoting Software — 5-Doc Pack | RenoCalc
Try Free — No Card Needed

AI Renovation Quoting Software

AI Renovation Quoting Software

Quick Answer

RenoCalc's AI renovation quoting software converts any floor plan into a professional renovation quote pack automatically. The AI reads the floor plan, measures rooms, calculates material quantities per trade, applies current UK material prices and labour rates, and produces: a fully-formulated spreadsheet, cover letter (free), schedule of works, method statements, and a 12-page contract pack.

Upload a floor plan. Get a complete renovation quote pack in 3 minutes. Built by a builder, for builders.

Trusted by 1,000+ builders · 4.9/5 from 200+ reviews · First quote free

Architect's floor plan with tape measure and pencil — RenoCalc AI renovation quoting software calculates renovation costs from any floor plan in under 3 minutes

The 5-Document Quote Pack

What You Get From One Upload

Every floor plan you upload generates five professional documents. Not a vague estimate. Not a single number. A complete quote pack ready to send to your client.

RenoCalc Spreadsheet
30+ sheets, 40,000 live formulas, every trade priced
Cover Letter
Branded, client-ready, PDF
Schedule of Works
Phased programme, trade by trade
Method Statements
HSE-aligned, all 12 trades
Contract Pack
12 pages, ready to sign

Generated in under 3 minutes. Yours to edit, print, send.

How It Works

From Floor Plan to Quote Pack — In 3 Steps

1
Upload your floor plan
Photo, PDF, hand sketch, Rightmove plan — any image works
2
AI reads the plan
Detects every room, measures every wall, calculates every trade
3
Quote pack delivered
5 documents, ready to send to your client

Live Demo

See It Happen

Stop reading. Watch the AI work on a real floor plan.

RenoCalc AI scanning a floor plan — detecting rooms, walls, doors and windows in real time

Try the live demo on the homepage →

12 Trades Covered

Every Trade Priced. One Quote.

RenoCalc calculates labour and materials across all 12 trades a UK renovation needs.

Plastering
Electrical 1st Fix
Electrical 2nd Fix
Plumbing & Heating
Tiling
Decorating
Flooring
Joinery & Carpentry
Roofing
Drainage
Groundworks
Externals

Who Uses It

Built For

Builders & Contractors

Stop spending evenings on quotes. Upload after a site visit, send the quote before you get home. Turn jobs around faster than any competitor in your area.

Property Developers

Found a deal on Rightmove? Upload the floor plan and get a renovation budget before the viewing ends. Make same-day offers with confidence.

Property Investors

Running BRR numbers? Stress-test deals from Zoopla floor plans in minutes. Compare ten properties in an afternoon instead of waiting weeks for builders to quote.

The Engine

40,000 Live Formulas. Every Quote. Yours to Edit.

  • Adjust any labour rate — every total updates
  • Change a material price — shopping list reflows
  • Edit a room dimension — entire quote recalculates
  • Add your markup — VAT calculated automatically
  • 30+ sheets, no setup needed
  • Open in any spreadsheet app
RenoCalc spreadsheet output — 30+ sheets with live formulas across every trade

No other quoting tool produces anything close.

Pricing

Simple Pricing. First Quote Free.

Free
£0
no card needed
1 credit — Try it free, no card
Get Started Free
Single
£9.99
one-off, never expires
1 credit, never expires — Perfect for one-off jobs
Buy Single Credit
Organisation
£74.99/mo
monthly subscription
20 credits/month — For teams
Go Organisation

Honest Comparison

Why Builders Choose RenoCalc Over Tradify, Powered Now, YourTradebase

Honest comparison. Where competitors win, we'll say so. Where they don't, the numbers speak.

Feature RenoCalc Tradify Powered Now YourTradebase
Reads floor plans✓✗✗✗
Generates 5-document quote pack✓✗✗✗
Live spreadsheet output✓✗✗✗
All 12 trades in one quote✓PartialPartialPartial
HSE-aligned method statements✓✗✗✗
12-page contract pack✓✗✗✗
CRM & invoicing✗✓✓✓
Job schedulingComing soon✓✓✓

RenoCalc isn't a CRM. If you need invoicing and scheduling, pair it with Tradify. But for quoting? Nothing comes close.

The Founder

Built by a Builder, For Builders

Pindi Sahota, builder and founder of RenoCalc, Coventry

Pindi Sahota — Builder, Founder, Coventry

I'm Pindi Sahota. I've spent 32 years on the tools — running my own jobs, managing subcontractors, doing the quoting on Sunday evenings while my family ate dinner without me.

RenoCalc is the tool I wish I'd had ten years into my career. Upload a floor plan. Get the quote. That's it. Every formula, every trade, every material — calculated by an AI that actually understands what a UK renovation costs.

It's not built by software developers who've never been on site. It's built by someone who has.

Stop Quoting on Sunday Evenings

First quote is free. No card. No signup gate. Costs me money every time someone uses it. I'd rather you tried it than read another sales page.

Generate My First Quote Free Already convinced? See pricing →

FAQ

Common Questions

What is AI renovation quoting software?
Software that uses AI to read your floor plan, measure rooms, and generate a complete renovation quote — covering labour, materials, schedules and contracts. RenoCalc is purpose-built for this. Upload any floor plan image, and within 3 minutes you have a 5-document quote pack ready to send to your client.
How is RenoCalc different from Tradify or Powered Now?
Tradify and Powered Now are CRM and invoicing tools — they help you manage clients and send invoices, but you still have to do the quoting yourself. RenoCalc does the quoting. It reads your floor plan, calculates 12 trades, and outputs a complete quote pack. Different tools for different jobs.
How accurate is the AI?
RenoCalc's AI reaches approximately 95% accuracy when you set a calibration reference on the floor plan. Without calibration, it's around 70%. Calibration takes 10 seconds. Read more in our AI construction estimating explainer.
What do I get with one quote?
Five documents: the RenoCalc Spreadsheet (30+ sheets with 40,000 live formulas), a branded cover letter, a phased schedule of works, HSE-aligned method statements for every trade, and a 12-page contract pack ready to sign. All delivered in under 3 minutes.
Can I edit the quote after it's generated?
Yes. The RenoCalc Spreadsheet has 40,000 live formulas. Change any labour rate, material price, or room dimension and every total updates automatically. Add your markup, adjust VAT, swap materials — it's your quote.
Does it work on mobile?
Yes. There's a web app at app.renocalcapp.com and an Android app on Google Play. iOS is in App Store review. Take a photo of a floor plan on site and have a quote before you leave the property.
What countries does it support?
RenoCalc supports labour rates and material pricing for over 150 countries. Built primarily for UK builders, but tested across UAE, USA, Australia, Ireland and Canada.
Do I need to install anything?
No. Use it in your browser at app.renocalcapp.com — or install the Android app from Google Play. No setup, no spreadsheet templates to import, no learning curve.

People Also Ask

Related Questions About AI Renovation Quoting

How long does it take to generate a renovation quote with AI?
RenoCalc generates a complete 5-document renovation quote pack in under 3 minutes from floor plan upload to download. The process is: upload the floor plan, review detected rooms, confirm, and download. No manual data entry required. Compare this to 4–6 hours for a traditional manual quote.
What's included in the 5-document renovation quote pack?
Every RenoCalc quote includes five documents: (1) a RenoCalc Spreadsheet with 30+ sheets and 40,000 live formulas covering all 12 trades, (2) a branded cover letter, (3) a phased schedule of works, (4) HSE-aligned method statements for every trade, and (5) a 12-page ready-to-sign contract pack. All generated automatically from your floor plan upload.
Can AI renovation quoting software replace manual estimating?
For first-pass renovation quotes and investor feasibility assessments, yes. RenoCalc achieves ~95% accuracy with floor plan calibration. For complex structural work or formal Bills of Quantities, manual review or a QS is still advisable. Most builders use the AI for 90% of jobs and reserve manual review for unusual or high-value projects. See the AI construction estimating explainer for accuracy benchmarks.
Does AI renovation quoting work for property investors?
Yes — property investors are one of the most common user groups. Upload a Rightmove or Zoopla floor plan before a viewing and have a renovation budget ready on the day. The AI floor plan scanner handles estate agent PDFs automatically, including scale detection. No manual measurement required.
How is RenoCalc different from spreadsheet templates?
Spreadsheet templates require you to measure every room, look up every material, and manually enter every figure. RenoCalc reads the floor plan and does all of that automatically. The output is a live spreadsheet — editable in exactly the same way as a template — but populated from real measurements rather than manual input. It is not a template; it is a fully calculated quote generated by AI. See AI material takeoff for how the quantities are derived.

More from RenoCalc

Keep Exploring