Everything you need — from getting your first quote to understanding construction costs, output documents and pricing plans. Written by a builder with 32 years on the tools.
New to RenoCalc? Start here. Get your first quote in under 3 minutes.
Create an account and generate your first complete renovation quote at no cost. Upload any floor plan to get started.
Upload a floor plan, set your preferences, download your quote pack. Here's what happens at each step.
JPEG, PNG, PDF, hand-drawn sketches — the AI floor plan scanner works with all common formats. See what produces best results.
Use the estimator tool to get an indicative renovation cost from your floor plan before committing to a full quote.
RenoCalc was built by Pindi Sahota — a builder with 32 years experience. Read why he built it and what problem it solves.
Need help getting started? Reach the team at support@renocalcapp.com or call 07463 537 535.
Understand the AI floor plan analysis, cost calculation and output generation process.
The AI measures room dimensions, wall lengths, floor areas and openings from your floor plan image. Here's how it works and what level of accuracy to expect.
From room measurements to material quantities to trade labour rates — understand the calculation methodology behind every quote.
How RenoCalc extracts material quantities directly from a floor plan image — plaster area, tile area, timber lengths and more.
How to get a complete material and labour takeoff from any floor plan, using RenoCalc's AI analysis.
A full breakdown of RenoCalc's quoting features — what's included, what formats it outputs, and how it compares to other tools.
Honest overview of what AI estimating software handles well, where human review is still needed, and how to get the most accurate results.
What RenoCalc produces and how to use each document with clients and on site.
The main quote output — a detailed Excel file showing costs for each trade, room by room. Covers plastering, tiling, carpentry, electrics, plumbing, decoration and more.
A professionally formatted cover letter summarising the project scope, total cost and payment terms — ready to send to the client without modification.
RenoCalc generates HSE-aligned method statements for the main trades. Read about what they must contain and when they're required on site.
The schedule of works phases the job in correct trade order — strip out first, finishing trades last. Here's how to read and adjust the output.
Understand the difference between a quote, a Bill of Quantities, and a schedule of rates — and when each is appropriate.
A RenoCalc quote is the start of the commercial relationship — read what a domestic building contract must contain to protect both parties.
Plans, credits, what's included at each tier and how billing works.
| Plan | Price | Quotes | Best For |
|---|---|---|---|
| Free | £0 | 1 quote | Try the platform — generate your first complete quote at no cost, no card needed |
| Starter | £9.99 / mo | Limited | Occasional quoting — sole traders and small one-person firms |
| Professional | £19.99 / mo | Regular | Growing building firms quoting several jobs per month |
| Business | £74.99 / mo | High volume | Busy contractors, developers and property investors |
| Enterprise | £399.99 / mo | Unlimited | Large firms, agencies and portfolio landlords needing unlimited quotes |
Full plan details and feature comparison: renocalcapp.com/pricing
The questions builders ask most often before and after signing up.
Detailed renovation cost breakdowns by project type — written by Pindi Sahota from 32 years of trade pricing.
Trade-by-trade pricing methods from a builder who has priced hundreds of real jobs.
How to read, measure and get costs from estate agent and architect floor plans.
Honest comparisons of builder quoting software — written from actual trade experience.
For developers, landlords and property investors who need accurate refurb costs before purchase.