BRRRR Strategy UK: Calculating Refurb Costs Accurately

This article is general guidance only and is not financial or investment advice. Property investment carries significant risk. Always consult qualified professionals — including a specialist mortgage broker, solicitor and financial adviser — before making any investment decisions.

brrrr strategy uk hero
The BRRRR strategy UK investors use to recycle capital depends entirely on accurate refurb cost calculation.

The BRRRR strategy UK investors talk about — Buy, Refurbish, Refinance, Rent, Repeat — sounds clean on paper. Buy a distressed property below market value, renovate it, refinance against the new valuation, pull your capital back out and move on to the next deal. The problem is that the whole model hinges on one number: the refurb cost. Get it right and the deal works. Get it wrong and you're stuck with capital locked in a deal that doesn't refinance as planned. This article covers how to calculate refurb costs accurately for a UK BRRRR deal — including how scope classification, contingency, rental standard requirements and refinance risk all affect the numbers.

How BRRRR Works in the UK

The core mechanic of BRRRR is equity creation through renovation. You buy a property that's worth less than it should be because it's in poor condition. You refurbish it. The refurbished value — what a surveyor will now value it at — is higher than what you paid plus what you spent. You refinance against that higher value, extracting the equity you've created, and use the capital to fund the next deal.

brrrr cycle diagram uk
The BRRRR cycle — Buy, Refurbish, Refinance, Rent, Repeat — requires accurate cost calculation at every stage to function as intended.

For the strategy to work in the UK, you need:

  • A purchase at a meaningful discount to the post-refurb value
  • A refurb that genuinely adds value — not just cosmetic work that lenders see through
  • A rental property that meets all legal standards for lettability
  • Mortgage finance available at the level you need to extract your capital

In the UK market specifically, finding the purchase discount is harder than it was in the years after the 2008 financial crisis. But distressed sellers, probate properties, properties with structural issues and unmortgageable properties at auction still exist. The refurb cost calculation is where the deal is won or lost.

Why Refurb Cost Matters More in BRRRR

In a straight buy-to-let, a refurb cost overrun of £5,000 reduces your profit but doesn't fundamentally change the investment structure. In a BRRRR deal, the same overrun has compounding effects.

brrrr vs buy to let roi uk infographic
Comparing BRRRR vs. standard buy-to-let ROI — the BRRRR model amplifies both gains and losses from refurb cost accuracy.

Here's why:

  1. Capital recycling efficiency — the whole point of BRRRR is to pull most of your capital back out at refinance. A refurb overrun means more capital stays locked in the deal, reducing how much you can deploy on the next one
  2. Refinance threshold risk — if total money in (purchase + refurb) exceeds 75% of the refinanced value, the deal may not refinance at the LTV you need. A cost overrun can push you over that threshold
  3. Timeline impact — refurb overruns often come with programme overruns. In a BRRRR deal, you're typically on bridging finance during the refurb — every extra week costs money

The discipline required for BRRRR refurb costing is therefore higher than for a standard renovation project. The numbers need to be right before you commit, not approximately right.

Refurb Scope for a BRRRR Property

The target refurb standard for a BRRRR property is: high enough to maximise the post-refurb valuation and meet rental standards; no higher. Specification creep — upgrading finishes beyond what comparable rental properties in the area justify — is money thrown at a vanity project that won't add pound-for-pound value at refinance.

Typical BRRRR refurb scope by level:

Scope level What's included When it applies
Light Full decoration, flooring, cleaning, minor repairs, garden Property is structurally sound with modern services
Medium New kitchen, new bathroom(s), boiler replacement, full decoration, flooring Property needs updating but services are compliant
Heavy Structural works, full rewire, re-plumb, damp, roof, new kitchen and bathrooms, full decoration Property is unmortgageable in current state

Most BRRRR deals in the UK involve medium or heavy refurbs — because light-refurb properties are typically already mortgageable and therefore priced closer to market value. The discount you need for BRRRR to work usually comes from properties with more serious condition issues.

brrrr refurb budget breakdown uk
A trade-by-trade refurb budget breakdown for a UK BRRRR deal — every line item affects your capital recycling efficiency.

Use RenoCalc to build the initial scope from the floor plan. Upload the estate agent floor plan, select your target refurb level, and the tool generates a trade-by-trade cost breakdown using current UK rates. You can use this as your working estimate during deal appraisal and refine it after the site survey.

What Rental Standards Require

A BRRRR property has to be lettable. That's not a nice-to-have — it's a legal requirement. The refurb scope must include everything needed to comply with current UK rental regulations.

Minimum requirements for lettable residential property in England

  • EICR (Electrical Installation Condition Report) — required for all rental properties. Must show no unsatisfactory items. An old or non-compliant electrical installation will fail the EICR and require remedial work or a full rewire
  • Gas Safety Certificate — required annually where there is a gas installation. Boilers and gas appliances must be in safe working order
  • EPC rating of E or above — current minimum under the Minimum Energy Efficiency Standards (MEES). Proposed future changes may require higher ratings — check current GOV.UK guidance
  • Smoke alarms — required on each storey of the property
  • Carbon monoxide alarms — required in any room with a fixed combustion appliance
  • HHSRS compliance — the Housing Health and Safety Rating System covers 29 hazard categories. A property with serious damp, inadequate heating, unsafe electrics or structural hazards will fail an HHSRS inspection

HMO additional requirements

If the BRRRR property is intended as an HMO (House in Multiple Occupation — typically 3 or more unrelated people), additional licencing, room size standards, kitchen and bathroom ratios, and fire safety requirements apply. HMO requirements vary by local authority. Always confirm with the relevant council before purchasing an HMO BRRRR.

tenant keys handover uk
Handing over keys to a tenant — the end goal of a BRRRR refurb. Meeting rental standards is a non-negotiable part of the budget.

Rental compliance costs are not optional extras — they're part of the refurb budget. A property that revalues well but can't legally be let is a failed BRRRR deal.

Trade-by-Trade Cost Reference

Here's a realistic cost reference for UK BRRRR refurbs in 2025. These are trade-standard specifications, not premium finishes.

Trade / element Typical UK range (2025) BRRRR notes
Kitchen (supply and fit) £5,000–£15,000 Trade spec; don't over-spec for rental
Bathroom (supply and fit) £3,500–£8,000 Durable fittings; avoid high-end for rental
Full rewire + EICR £5,000–£11,000 Include certification cost; mandatory for letting
Boiler and heating system £2,500–£7,000 Include gas safety cert; annual ongoing cost
Plastering £2,500–£6,000 Full skim for newly rewired properties
Flooring (LVT throughout) £2,500–£6,000 LVT more durable than carpet for rental
Decoration (full) £2,000–£4,500 Neutral palette; landlord-standard
Roof repairs £600–£5,000 Full re-roof: £6,000–£14,000
Damp treatment £1,500–£6,000+ HHSRS requires damp to be addressed
Windows (replacement) £4,000–£8,000 Improves EPC rating; FENSA cert required
Structural works £3,000–£18,000+ Engineer's spec required first
Insulation (loft and cavity) £500–£2,000 Improves EPC; may be grant-assisted
Building control / compliance £500–£2,000 For structural, rewire, extension

Contingency in a BRRRR Deal

In a BRRRR deal, contingency does double duty. It protects against cost overruns — and it protects your capital recycling target. A refurb that comes in 15% over budget doesn't just hurt your profit; it can prevent you from refinancing at the LTV you need to exit the bridging finance.

Estimation stage Recommended contingency for BRRRR
Desktop estimate (floor plan and photos) 25–30%
Post-site survey, pre-detailed quotes 15–20%
Detailed trade quotes, surveyed property 10–15%
Pre-1970s property or structural scope Minimum 15% at any stage
brrrr investor portfolio laptop
Managing a BRRRR portfolio requires accurate refurb cost tracking across multiple deals simultaneously.

Don't let the pressure to make a deal work lead you to undercut the contingency. If the deal only stacks up with a 5% contingency on an unsurveyed property, the deal doesn't stack up. Find a better purchase price or a better deal.

Refinance Risk and How to Manage It

Refinance risk is the risk that the post-refurb valuation comes in lower than expected — meaning you can't extract as much capital as planned. In the worst case, you can't refinance at all at the LTV you need.

brrrr refinance equity recycling flowchart
The refinance equity recycling flowchart for a UK BRRRR deal — showing how refurb costs feed directly into the capital extraction calculation.

Sources of refinance risk

  • Overestimating post-refurb value — using sold prices from a different street, different property type or different condition as comparables
  • Surveyor conservatism — mortgage surveyors are often more conservative than estate agents' valuations. Allow for a 5–10% discount on the estate agent's optimistic projection
  • Market movement — if the property market softens during a long refurb, comparable values shift downwards
  • Refurb quality issues — a surveyor who notes incomplete or poor-quality work will reflect this in the valuation

How to manage refinance risk

  • Use actual sold prices from Land Registry (via Zoopla, Rightmove or Land Registry directly) not asking prices for your GDV estimate
  • Use comparable properties that match your target specification — not the best house on the street
  • Get an informal opinion of value from a local letting agent before committing to the deal
  • Build a minimum acceptable refinance value into your deal appraisal — the point below which you wouldn't proceed
  • Make sure the refurb is genuinely finished to the standard you're claiming when the surveyor visits
uk property mortgage completion documents
Mortgage completion — the refinance stage where the BRRRR capital recycling is realised or where unexpected shortfalls become apparent.

Running the BRRRR Deal Analysis

Here's how a complete BRRRR deal analysis looks when the refurb cost is properly accounted for.

Example deal

Item Amount
Purchase price £95,000
Stamp duty (second property surcharge) £5,700
Legal fees £1,500
Bridging finance (est. 4 months at 0.75%/month) £2,850
Refurb cost (medium scope) £28,000
Contingency (15%) £4,200
Total money in £137,250
Post-refurb valuation £175,000
Refinance at 75% LTV £131,250
Capital remaining in deal £6,000
Monthly rental income (target) £900
Mortgage payment (est.) £580
Monthly cashflow (pre-management/maintenance) £320

In this example, the deal leaves only £6,000 of the original capital in the property. That capital has effectively been recycled into a buy-to-let asset generating positive monthly cashflow. The example is illustrative only — tax, management fees, void periods and maintenance costs will all affect actual returns. Get proper advice from a qualified financial adviser before investing.

Now stress-test the refurb cost. If the refurb comes in at £35,000 instead of £28,000 — which is entirely possible if hidden damp or electrical issues are found — total money in rises to approximately £145,050. The refinance still provides £131,250. Capital remaining in the deal becomes £13,800. Still workable, but the deal is significantly less efficient. If the refurb runs to £45,000 (which can happen on a heavier-scope property that was misclassified), total money in exceeds the refinance value. The deal no longer works.

That's why accurate refurb costing isn't just a nice-to-have in a BRRRR deal — it's the number the entire deal rests on.

To speed up the floor-plan-to-budget stage, use RenoCalc — upload the estate agent floor plan and get a structured trade-by-trade estimate in under 3 minutes. Use the floor plan cost estimator to screen multiple properties quickly and focus your survey time on the deals with the strongest numbers.

For more detail on pre-purchase estimation, read our guide on how to estimate renovation costs before buying a property. If you're considering flipping rather than holding, our guide to costing a refurb before you offer covers that exit strategy in detail.

uk rental property exterior brrrr
A UK rental property post-BRRRR refurb — kerb appeal matters for both the refinance valuation and tenant attraction.

Frequently Asked Questions

What does BRRRR stand for?

BRRRR stands for Buy, Refurbish, Refinance, Rent, Repeat. It's a property investment strategy where you purchase a distressed or below-market property, renovate it to increase its value, refinance to pull equity back out, then rent it to tenants. The refinanced capital is then recycled into the next deal. The strategy works best when the refurbished value is meaningfully higher than the total money in — purchase price plus renovation costs plus purchase expenses.

What refurb standard do I need for a BRRRR property to be lettable?

To be legally lettable in England, a property must meet the Housing Health and Safety Rating System (HHSRS) standards and pass an electrical installation condition report (EICR). It also needs a valid gas safety certificate, a current EPC of at least E (though EPC minimums are expected to rise), smoke alarms on each floor, and a carbon monoxide alarm where required. For HMOs, additional licensing requirements apply. A refurb that's good enough to sell to a homebuyer may still need extra work to meet rental standards.

How do I calculate the refinance uplift on a BRRRR property?

The refinance uplift is the difference between your total money in (purchase price + renovation costs + purchase expenses) and the refinanced loan value (typically 70–75% of the new valuation). If you bought a property for £100,000, spent £30,000 on refurb and paid £5,000 in fees — total in is £135,000. If it revalues at £175,000 and you refinance at 75% LTV, your new loan is £131,250. You've nearly recycled all your capital, leaving only £3,750 in the deal. This is the core of what makes BRRRR work — but it requires the refurb cost to be accurately forecast, not optimistically estimated.

What contingency should I use on a BRRRR refurb?

Use 15–20% contingency on a BRRRR refurb after a site survey, and 25% or more at the desktop estimation stage. In a BRRRR deal, cost overruns directly reduce the equity you can pull out at refinance. A 10% cost overrun on a £35,000 refurb is £3,500 — that's capital that stays in the deal rather than being recycled into the next one. The cost of an inaccurate refurb estimate in a BRRRR deal is higher than in a straight flip, because it affects both current deal profitability and your ability to deploy capital into the next deal.

What happens if the refinance valuation comes in lower than expected?

If the refinance valuation is lower than your target, you pull out less equity than planned — meaning more capital stays locked in the deal. In the worst case, you can't refinance at all because the loan-to-value threshold isn't met. This is refinance risk, and it's one of the two biggest risks in the BRRRR model (the other being refurb cost overrun). Protect against it by using conservative comparable evidence for your projected valuation, getting a desktop valuation from a local agent before committing to the deal, and building in a minimum acceptable refinance figure that still makes the deal worthwhile.

Is BRRRR suitable for beginners?

The BRRRR strategy involves multiple complex components: purchasing below market value, managing a renovation, navigating a mortgage refinance and operating a rental business. Each of these has its own risks and requires specific knowledge. This article is general guidance only and not financial advice. For beginners, working with experienced professionals — including a specialist mortgage broker, property solicitor and experienced builder — reduces the risk of costly mistakes at each stage. The strategy is well-documented, but understanding it in theory and executing it profitably are very different things.

The Refurb Cost Is the Deal

In the BRRRR strategy, the refurb cost isn't just a line in the budget — it's the variable that determines whether the deal works, how much capital you extract at refinance, and whether you can move on to the next deal on schedule. Get it right and the model functions as designed. Get it wrong and you're stuck, with capital locked in a deal that didn't refinance as planned and a timeline that's running up finance costs every week.

Build your refurb cost from a trade-by-trade scope, not a single rough number. Include every trade that applies. Carry a meaningful contingency. Account for rental compliance costs as non-negotiable. And stress-test your deal appraisal against a realistic refinance valuation — not the optimistic one.

If you want a fast floor-plan-to-budget estimate to use as your starting point, try RenoCalc — upload the estate agent floor plan and get a structured UK renovation budget in under 3 minutes.

Build Your BRRRR Refurb Budget From the Floor Plan

RenoCalc turns any estate agent floor plan into a trade-by-trade renovation budget in under 3 minutes. Get the numbers right before you make your offer.

Try RenoCalc Free
Pindi Sahota

Pindi Sahota

Pindi has spent 30+ years in the building trade, running building projects across the UK. He is the founder of RenoCalc — the AI quoting app that turns floor plans into full job quotes in under 3 minutes. Based in Coventry, Director of Future Build Cov Ltd.

See It Happen

Upload a Floor Plan.
Get 5 Professional Documents.

Watch RenoCalc scan a floor plan, calculate every trade, and produce your complete quote pack — Excel, cover letter, schedule of works, method statements and contract pack — in under 3 minutes.

app.renocalcapp.com
Living Rm
Master Bed
Kitchen
Bath
Bed 2
Upload Your Floor Plan
JPG, PNG, PDF, CAD — any format works
AI Scanning Floor Plan
Living Room4.8 × 6.2m
Master Bedroom4.2 × 5.1m
Kitchen2.8 × 3.6m
Bathroom2.1 × 2.8m
Bedroom 23.4 × 4.0m
Detected
0
Rooms found
0m²
Total floor area
Trades calculating
Plastering
Electrical
Plumbing
Tiling
Decorating
Flooring
Joinery
Roofing
HomeInsertFormulasData RenoCalc_Quote_3BedSemi_2026.xlsx
Quote Summary
Room Breakdown
Shopping List
Radiator Schedule
#
Trade / Description
Quantity
Unit
Rate
Total
Live formulas: 0
RenoCalc_CoverLetter_3BedSemi.pdf
Sahota Building Services
Licensed Contractor • Coventry • 07XXX XXX XXX
21st March 2026
To: Mr & Mrs Johnson, 14 Elm Drive, Coventry CV3 4BN
RE: Full Renovation Quotation — 3-Bedroom Semi-Detached

Thank you for the opportunity to quote for your renovation project. Following a thorough analysis of the floor plans provided, I am pleased to submit our comprehensive quotation covering all works as discussed.

This quotation covers all 12 trades required for the full renovation including strip-out, stud partitions, electrical, plumbing & heating, windows & doors, plastering, kitchen, bathroom, tiling, flooring, joinery and decorating.

Total Project Cost (inc. materials & labour)
£94,301

All works are fully insured. Method statements and schedule of works are enclosed. A contract pack is included for your review and signature prior to commencement.

Yours sincerely,
Pindi Sahota
Director, Sahota Building Services
RenoCalc_ScheduleOfWorks_3BedSemi.pdf
Schedule of Works
3-Bed Semi, Coventry • Start: 4th April 2026
1
Strip Out & Waste Removal
Days 1–3
Remove existing fixtures & fittings
Skip loading & site clearance

2
First Fix Electrics, Plumbing & Stud Work
Days 4–10
Stud partition construction
First fix electrics & plumbing

3
Windows & External Doors
Days 11–13
Remove & dispose of existing windows/doors
Install UPVC windows & composite doors

4
Plastering
Days 14–18
Full skim coat all rooms
Ceiling skim & angle beads

5
Kitchen Fit-Out
Days 19–25
Install units, worktop & appliances
Kitchen electrical & plumbing connections

6
Bathroom Fit-Out
Days 26–32
Tank & waterproof, fit suite & shower
Bathroom electrical & plumbing 2nd fix

7
Tiling & Flooring
Days 33–40
Floor & wall tiling
Engineered oak flooring throughout

8
Joinery, Second Fix & Decorating
Days 41–48
Skirting, architrave & internal doors
Radiators, sockets & full decoration

9
Snagging, Testing & Handover
Days 49–55
Electrical & plumbing testing/certification
Final snagging & client walkthrough
RenoCalc_MethodStatements_AllTrades.pdf
Method Statement — Plastering Works
HSE Compliant 12 Trades Included
Scope of Works
Full skim coat to all walls and ceilings — 87m²
Installation of angle beads to all external corners
Making good around all openings and service penetrations
PPE & Safety Requirements
Dust masks (FFP2 minimum) worn at all times during mixing
Safety goggles when applying plaster overhead
Non-slip footwear on all wet areas
Operative Signature & Date
Supervisor Sign-Off
RenoCalc_ContractPack_3BedSemi.pdf
12-PAGE CONTRACT PACK
Domestic Building Contract
Renovation Works — 3-Bedroom Semi-Detached, Coventry
Contractor
Sahota Building Services
Pindi Sahota, Director
Client
Mr & Mrs Johnson
14 Elm Drive, Coventry
1.
Scope of works as per attached quotation dated 21/03/2026
2.
Contract sum: £94,301 inclusive of materials and labour
3.
Payment terms: 30% deposit, stage payments, 5% retention on completion
4.
Works to commence 4th April 2026, estimated 55 working days
Contractor signature & date
Client signature & date
Generated in 2 min 41 sec

5 Professional Documents. Ready to Send.

Excel Estimate
40,000+ live formulas, all 12 trades
Cover Letter
Branded, professional, client-ready
Schedule of Works
Phased programme, trade by trade
Method Statements
HSE-aligned, all 12 trades
Contract Pack
12 pages, ready to sign
Total time from upload to complete pack: 2 min 41 sec
1
Upload floor plan
2
AI scans & measures
3
Excel quote
4
Cover letter
5
Schedule of works
6
Method statements
7
Contract pack

See It In Action

One Upload. Five Documents. Everything Covered.

Click each document type to see exactly what RenoCalc produces — from a single floor plan upload.

AI Floor Plan Scanner

Upload Any Floor Plan.
The AI Does the Rest.

Upload a photo, PDF, estate agent drawing or hand sketch. RenoCalc's AI reads every room, measures every wall, and calculates every trade across your entire property — automatically. No site visit, no tape measure, no hours lost.

  • Detects room dimensions, wall lengths, ceiling heights and perimeters
  • Calculates all 12 trades — plastering, electrics, plumbing, tiling and more
  • Works with photos, PDFs, CAD files, screenshots and hand sketches
  • Produces a complete 5-document quote pack in under 3 minutes
Try It Free — Upload a Plan Now
RenoCalc — Scanning floor plan...
Living Room
4.8 × 6.2m
Master Bedroom
4.2 × 5.1m
Kitchen
2.8 × 3.6m
Bathroom
2.1 × 2.8m
Bedroom 2
3.4 × 4.0m
AI Scanning — 5 rooms detected
87m²
Total floor area
12
Trades calculated
5
Docs generated
Live Excel Output

40,000+ Live Formulas.
Every Trade. Every Room.

Your quote lands in a fully loaded Excel spreadsheet. Over 40,000 live working formulas covering all 12 trades — every material quantity, every labour rate, every room breakdown. Change any figure and the entire estimate recalculates instantly. No other app on the market produces anything close.

  • Full trade breakdown: plastering, electrics, plumbing, tiling, decorating and more
  • Room-by-room cost breakdowns with totals that roll up automatically
  • Adjust labour rates and material prices — every formula updates everything
  • Full merchant shopping list included — hand to your supplier and order in one
Generate My Free Excel Quote
RenoCalc_Quote_3BedSemi_2026.xlsx
Quote Summary Room Breakdown Shopping List Radiator Schedule
Trade / ItemQtyUnit RateTotal
KITCHEN=SUM(below)£19,000
Units, worktop, appliances, fitting1 ls—£19,000
BATHROOM=SUM(below)£13,000
Suite, shower, waterproofing, fitting1 ls—£13,000
PLUMBING & HEATING=SUM(below)£11,500
Radiators, boiler, pipe, fittings, TRVs6 rads£420£2,521
TOTAL — ALL 12 TRADES£94,301
12 trades covered
40,000+ live formulas
Ready to send
HSE-Compliant Safety Docs

Method Statements.
Every Trade. Site-Ready.

RenoCalc generates a full, HSE-aligned method statement for every trade working on the project. Scope of works, PPE requirements, risk controls and operative sign-off boxes — all included automatically. Hand them over on site day one. No more scrambling for safety paperwork.

  • Covers all 12 trades — plastering, electrical, plumbing, tiling and more
  • Operative sign-off boxes included — ready to hand over on site
  • PPE requirements, risk controls and scope of works per trade
  • No other quoting app generates method statements automatically
Get My Method Statements Free
Method_Statements_AllTrades.pdf
Method Statement
Plastering Works — 3-Bed Semi, Coventry
HSE Compliant12 Trades
Scope of Works
Full skim coat to all walls and ceilings — 87m²
Angle beads to all external corners — 24 nr
Making good around all service penetrations
PPE & Safety Requirements
FFP2 dust masks during mixing and application
Safety goggles when applying overhead
Non-slip footwear on all wet areas
Operative signature & date
Supervisor sign-off
All 12 trade statements included • Operative sign-off on every page
Professional Correspondence

A Cover Letter That
Wins the Job.

RenoCalc generates a branded, letter-headed cover letter — with your company logo, client address, project total and professional wording — ready to email the moment your quote is complete. Stop sending rough figures on a text message. Send something that makes clients choose you.

  • Branded with your company name, logo and contact details
  • Client address, project description and total cost all included
  • Professional wording — looks like it took hours, took seconds
  • Delivered as a PDF alongside your Excel estimate and contract pack
Get My Cover Letter Free
CoverLetter_3BedSemi_Johnson.pdf
Sahota Building Services
Licensed Contractor • Coventry • 07XXX XXX XXX
21st March 2026
To: Mr & Mrs Johnson, 14 Elm Drive, Coventry CV3 4BN
RE: Full Renovation Quotation — 3-Bedroom Semi-Detached

Thank you for the opportunity to quote for your renovation project. Following thorough AI analysis of the floor plans provided, we are pleased to submit our comprehensive quotation covering all trades as discussed.

This quotation covers all 12 trades including strip-out, stud partitions, electrical, plumbing & heating, windows & doors, plastering, kitchen, bathroom, tiling, flooring, joinery and decorating.

Total Project Cost (materials & labour)
£94,301
Yours sincerely,Pindi Sahota — Director, Sahota Building Services
Legal Protection

A 12-Page Contract.
Ready to Sign.

RenoCalc includes a full 12-page domestic building contract pack — ready to sign before a tool is picked up. It protects you and your client: scope of works, payment terms, retention, commencement date and more. No other quoting app on the market generates a contract pack automatically.

  • 12 pages covering scope, payment, retention, disputes and more
  • Contractor and client signature sections — ready for review and signing
  • Auto-filled with your project details, dates and contract sum
  • Tradify, Powered Now and YourTradebase do not offer this
Get My Contract Pack Free
ContractPack_3BedSemi_Johnson.pdf
12-PAGE CONTRACT PACK
Domestic Building Contract
Full Renovation — 3-Bedroom Semi-Detached, Coventry
Contractor
Sahota Building Services
Pindi Sahota, Director
Client
Mr & Mrs Johnson
14 Elm Drive, Coventry
1.
Scope of works as per quotation dated 21/03/2026 — all 12 trades
2.
Contract sum: £94,301 inclusive of all materials and labour
3.
Payment: 30% deposit, stage payments, 5% retention on completion
4.
Works to commence 4th April 2026, estimated 55 working days
Contractor signature & date
Client signature & date
Project Programme

A Phased Programme.
From Day One to Done.

RenoCalc generates a full phased Schedule of Works — trade by trade, phase by phase — that your client and site team can follow from the first day on site. No more verbal commitments. A written programme that sets expectations, protects your time and shows clients you run a professional operation.

  • Phased programme — strip out, 1st fix, plastering, 2nd fix, finishes
  • Trade-by-trade breakdown with day estimates for each phase
  • Sets clear expectations — clients know what happens when
  • Included automatically — no extra time needed from you
Get My Schedule of Works Free
ScheduleOfWorks_3BedSemi_2026.pdf
Schedule of Works
3-Bed Semi, Coventry • Start: 4th April 2026 • Est. 55 working days
1
Strip Out & Preparation
Remove fixtures, skip loading, site clearance
Days 1–3
2
First Fix & Stud Work
Stud partitions, first fix electrics & plumbing
Days 4–10
3
Windows & External Doors
Remove & install UPVC windows, composite doors
Days 11–13
4
Plastering
Full skim coat all rooms, ceiling skim
Days 14–18
5
Kitchen Fit-Out
Units, worktop, appliances, connections
Days 19–25
6
Bathroom Fit-Out
Suite, shower, waterproofing, 2nd fix
Days 26–32
7
Tiling & Flooring
Floor & wall tiles, engineered oak throughout
Days 33–40
8
Joinery, Second Fix & Decorating
Skirting, doors, radiators, sockets, full decoration
Days 41–48
9
Snagging & Handover
Testing, certification, final walkthrough
Days 49–55