Simple, Transparent Pricing from £9.99/mo | RenoCalc
Try Free — No Card Needed
Free
Try RenoCalc with your first project
£0
1 download credit included
 
  • 1 AI floor plan analysis
  • Full room measurements
  • Cover letter — always free
  • 1 download credit included
  • No credit card required
Get Started Free
Single Credit
Perfect for one-off projects
£9.99
one-off — never expires
 
  • 1 download credit
  • Cover letter — always free
  • Excel spreadsheet — 1 credit
  • Contract pack PDF
  • Method statements
  • Schedule of works
  • Credit never expires
Buy Now
Organisation
Teams that need volume & collaboration
£74.99
per month
 
  • 20 credits/month
  • Cover letter — always free
  • All 4 document types
  • Credits reset every 30 days
  • Priority support
  • Multiple users
Go Organisation
Enterprise
Unlimited power for large operations
£399.99
per month
 
  • Unlimited credits/month
  • Cover letter — always free
  • All 4 document types — unlimited
  • Multiple user accounts
  • Dedicated support
  • API access
  • White-label options
Go Enterprise

Secure payments powered by Stripe

Visa Mastercard Amex Apple Pay Google Pay
30 DAY GUARANTEE

30-Day Money-Back Guarantee

We're confident RenoCalc will transform the way you quote. If it doesn't save you time or simply isn't right for you — we'll refund every penny. No questions asked.

Full refund
No questions asked
Cancel anytime
How to get the most accurate results

RenoCalc's AI analyses your floor plan and generates a detailed quote in minutes. Once you download the Excel spreadsheet, verify measurements on-site and update the Rooms Input sheet. All formulas across every trade automatically recalculate, giving you a precisely calculated, site-verified quote.

Compare Plans

Everything Included

See exactly what's in each plan at a glance

Feature Free Single Professional Organisation Enterprise
Download credits11 (no expiry)4/mo20/moUnlimited
Cover letter (PDF)✓ Free✓ Free✓ Free✓ Free✓ Free
AI floor plan analysis✓✓✓✓✓
Full room measurements✓✓✓✓✓
Excel spreadsheet (1 credit)✕✓✓✓✓
Contract pack PDF (1 credit)✕✕✓✓✓
Method statements (1 credit)✕✕✓✓✓
Schedule of works (1 credit)✕✕✓✓✓
Multiple users———✓✓
API access————✓
White-label options————✓
Support——✕PriorityDedicated
FAQ

Frequently Asked Questions

Sign up for free and get 1 download credit — no credit card required. Your cover letter is always free. Use your credit to download any one file: the Excel spreadsheet, contract pack, method statements, or schedule of works.

Download credits are used for the Excel spreadsheet, contract pack, method statements, and schedule of works. Each file costs 1 credit. Your cover letter PDF is always free — no credits needed.

Yes, absolutely. No long-term contracts. Cancel anytime from your account settings. You'll retain access until the end of your current billing period.

RenoCalc's AI produces estimates based on floor plan analysis — highly useful for rapid quoting. We always recommend verifying critical measurements on-site before submitting a final quote.

Yes. RenoCalc generates quotes in 150+ countries with localised pricing, currencies, and material costs. Whether you're quoting in the UK, Ireland, India, or Australia, the app adapts to your local market.

All major credit and debit cards (Visa, Mastercard, Amex) plus Apple Pay and Google Pay. All payments securely processed through Stripe.

Ready to Stop Wasting Time on Quotes?

Join 1,000+ builders saving hours every week with RenoCalc.

Try Free — No Card Needed

Not sure yet? Take the 3-Minute Challenge — see how fast you can quote a real job.